My Account Log in

1 option

California's electricity quandary.

LIBRA AS36.R3 R-1084, etc. v.1-v.3 v.1(estimating future demand)=R-1084 v.2(planning for power plant siting)=R-1115 v.3(slowing the growth rate)=R-1116
Loading location information...

Available from offsite location This item is stored in our repository but can be checked out.

Log in to request item
Format:
Book
Contributor:
Mooz, W. E.
California. Resources Agency.
Series:
R (Rand Corporation) ; R-1084-NSF/CSRA etc.
[Rand Corporation. Rand report] R-1084-NSF/CSRA; R-1115-RF/CSA; R-1116-NSF/CSA.
Language:
English
Subjects (All):
Electric power--California.
Electric power.
Electric power-plants--Location--California.
Electric power-plants.
Electric power-plants--Location.
Electric power-plants--Environmental aspects.
California.
Electric power-plants--Environmental aspects--California.
Physical Description:
3 volumes ; 28 cm.
Place of Publication:
Santa Monica : Rand, 1972.
Contents:
1. Mooz, W. E. and Mow, C. C. Estimating future demand.
2. Ball, R. H., and others. Planning for power plant siting.
3. Doctor, R. D., and others. Slowing the growth rate.
Notes:
Vol. 1 prepared for the Resources Agency of California; v. 2-3 prepared for the California State Assembly.
Includes bibliographical references.
OCLC:
5150595

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Library Catalog Using Articles+ Library Account