1 option
California's electricity quandary.
LIBRA AS36.R3 R-1084, etc. v.1-v.3 v.1(estimating future demand)=R-1084 v.2(planning for power plant siting)=R-1115 v.3(slowing the growth rate)=R-1116
Available from offsite location
- Format:
- Book
- Series:
- R (Rand Corporation) ; R-1084-NSF/CSRA etc.
- [Rand Corporation. Rand report] R-1084-NSF/CSRA; R-1115-RF/CSA; R-1116-NSF/CSA.
- Language:
- English
- Subjects (All):
- Electric power--California.
- Electric power.
- Electric power-plants--Location--California.
- Electric power-plants.
- Electric power-plants--Location.
- Electric power-plants--Environmental aspects.
- California.
- Electric power-plants--Environmental aspects--California.
- Physical Description:
- 3 volumes ; 28 cm.
- Place of Publication:
- Santa Monica : Rand, 1972.
- Contents:
- 1. Mooz, W. E. and Mow, C. C. Estimating future demand.
- 2. Ball, R. H., and others. Planning for power plant siting.
- 3. Doctor, R. D., and others. Slowing the growth rate.
- Notes:
- Vol. 1 prepared for the Resources Agency of California; v. 2-3 prepared for the California State Assembly.
- Includes bibliographical references.
- OCLC:
- 5150595
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.