1 option
Erection of truss spans: Castleton bridge, describing the erection by progressive cantilever methods of 1-600' and 1-400' double track thru riveted truss spans, and the procedure adopted in fabrication and erection to secure in the finished structure the stress conditions provided for in designing.
LIBRA 378.748 POS1923.22
Available from offsite location
- Format:
- Book
- Manuscript
- Thesis/Dissertation
- Author/Creator:
- Taylor, Granville Lewis.
- Language:
- English
- Subjects (All):
- Penn theses--Civil Engineering.
- Civil Engineering--Penn theses.
- Local Subjects:
- Penn theses--Civil Engineering.
- Civil Engineering--Penn theses.
- Physical Description:
- 24 unnumbered l. : 5 blueprints (in pocket). ; 28 cm
- Production:
- [Philadelphia], 1923.
- Notes:
- Thesis (M.S. in Civil Engineering)--Graduate School of Arts and Sciences, University of Pennsylvania, 1923.
- OCLC:
- 81368140
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.