1 option
Sustainable Construction Management Processes.
- Format:
- Book
- Author/Creator:
- Benigno Avila Calle, Marco.
- Series:
- Engineering and Sustainable Development Series
- Language:
- English
- Physical Description:
- 1 online resource (283 pages)
- Edition:
- 1st ed.
- Place of Publication:
- New York : Nova Science Publishers, Incorporated, 2025.
- Summary:
- This book is an important guide for construction professionals interested in the intersection between sustainable construction and environmental risk management. Through a series of chapters that address everything from disaster assessment and its impacts to the application of innovative methodologies such as building information modeling (BIM) and life cycle thinking, the text provides a thought-provoking theoretical and practical framework for environmental responsibility in the construction industry. The chapters are designed to provide an in-depth understanding of contemporary challenges in construction, addressing the need for economic development that respects the labor rights of construction workers and promotes sustainability within a construction project, enabling prevention and planning from development for new projects, or mitigation and restoration for existing buildings. Each section offers conceptual and methodological tools that facilitate the integration of sustainability criteria into real projects, guiding readers towards a more conscious and efficient practice. In addressing the discipline of project management and the crucial role of labor management, the document does not limit itself to theory but emphasizes the importance of collaboration and proper planning in project execution. This makes it an essential guide for practitioners and academics seeking not only to comply with regulations, but also to transform the way construction projects are conceived and developed. In conclusion, this book stands as an essential resource for those who wish not only to understand the risks and opportunities presented by sustainable construction, but also to apply it effectively and ethically in their practices.
- Contents:
- Intro
- Contents
- Foreword
- Preface
- Acknowledgments
- Chapter 1
- Innovation and Organization Processes in Construction
- Abstract
- Introduction
- Problem
- Arguments in Favor
- Arguments Against
- Theoretical Framework
- Empathy Phase
- Definition Phase
- Ideation Phase
- Prototyping Phase
- Illustrations on Paper
- Video Stories
- Models
- Evaluation Phase (Testing)
- Objectives
- General
- Specific
- Methodology
- Traditional Construction Process
- Design Thinking Approach
- Case Study
- Data Collection Techniques
- Data Analysis
- Design
- Population and Sample
- Data Collection
- Insight
- Results
- Discussion of Results
- Conclusion
- References
- Chapter 2
- Legislative Framework for Construction
- 1. Who Am I Going to Hire?
- 2. Determine Who Is Responsible for Monitoring and Evaluation
- 3. How Do You Define Authority and Responsibility in the Organization?
- 4. What Is the Scope of the Positions of Authority and Responsibility in Control?
- 5. Which Decisions Should Be Centralized and Which Should Be Decentralized?
- 6. What Type of Structural Model Should We Establish?
- a. The Simple Structure
- b. Functional Structure
- c. The Divisional Structure Seeks to Work by Results
- d. Purpose of the Team-Based Structure
- e. The Project-Based Matrix Structure
- f. The Borderless Structure
- Discussion of the Results
- Plan with the Awareness that Work Is a Human Right
- The Salary
- Construction and Public Works Workers' Benefits
- 1. Sectoral Basic Salary
- 2. Thirteenth and Fourteenth Remuneration Benefit
- 3. Holiday Entitlement
- 4. Supplementary and Extraordinary Hours.
- 5. The Night Shift
- 6. Reserve Funds
- 7. Profits
- Analysis of Labor Contracting Modalities in the Construction Sector and Public Infrastructure Works
- 1. Express Contract
- 2. Express Written Contract
- a. Type of Contract to Be Signed
- b. Place and Date of Celebration
- c. Remuneration Agreed Upon
- d. Working Hours
- e. Time of Duration
- f. Position, Work, or Activity to Be Performed
- g. Name of Employer
- h. Employer's RUC or ID Number
- i. Workplace Address
- j. Type of Company
- k. Worker's Name
- l. Date of Birth
- m. Passport or Identification Card
- n. Worker's Home Address
- o. Background and Contracting
- p. Employer's Obligations
- q. Additional Employee Obligations
- r. Termination Process
- s. Jurisdiction and Competence
- t. Registration at the Ministry of Labor
- 3. Express Verbal Contract
- 4. Tacit Contract
- 5. Contract for Hire
- 6. Contract to Jornal
- 7. Seasonal Contract
- 8. Temporary Contract
- 9. Indefinite-Term Contract with a Probationary Period
- 10. Contract for Certain Work
- 11. Contract for Specific Work or Service within the Line of Business
- 12. Contract per Task
- 13. Contract to Unbundling
- 14. Group Contract
- 15. Equipment Contract
- 16. Permanent Part-Time Contract
- Chapter 3
- Project Management in Sustainable Construction
- The Life Cycle of Processes towards Sustainable Construction
- The Project and Product Life Cycle
- Organizational Relationships
- Knowledge Areas Help Sustainable Construction
- Areas of Knowledge and Their Interaction
- Basic Definitions
- Projects and Operations.
- The Project and Product Life Cycle
- Triple Constraint in Projects
- Classic Triple Constraint
- Extended Triple Constraint
- Life Cycle Characteristics
- Knowledge Areas and Their Interaction
- Scope, Schedule, Cost, Quality Management
- Scope Management
- Schedule Management
- Cost Management
- Quality Management
- Resource, Communications, Risk, Procurement and Stakeholder Management
- Resource Management
- Communications Management
- Risk Management
- Procurement Management
- Types of Contracts
- Stakeholder Management
- Integration Management, Health and Hygiene, Environment, Financial, Claims
- Integration Management
- Health and Safety Management
- Environmental Management
- Mandatory Legal Requirements
- Financial Management
- Claims Management
- Claims Management Plan
- Monitoring and Control: If a Complaint Arises, Be Prepared to
- Chapter 4
- BIM Management Applied to Architectural Projects
- Development
- Concept Management
- Building Information Modeling (BIM)
- Construction Information Model (MIC)
- Levels of Maturity BIM
- BIM Uses
- Design and Planning
- Analysis and Simulation
- Cost Estimation
- Construction
- Operation &
- Maintenance
- BIM Benefits
- BIM Software
- Open BIM
- IFC (Industry Foundation Classes)
- LOD (Level of Development)
- COBie (Construction Operations Building Information Exchange)
- BEP (BIM Execution Plan)
- BIM Manager
- VDC (Virtual Design and Construction)
- IPD (Integrated Project Delivery)
- Multidisciplinary Collaboration
- Point Cloud
- Building Lifecycle Management
- Clash Detection
- BIM Protocol
- BIM Object
- Virtual Reality (VR) and Augmented Reality (AR).
- Common Data Environment (CDE)
- Exchange of Information Requirements (EIR)
- Importance of BIM Management in Architectural Projects
- Efficiency and Optimization in Design
- Improved Collaboration and Communication
- Reduction of Errors and Rework
- Reduction of Costs and Construction Time
- Ease of Building Lifecycle Management
- Steps to Implement BIM Management in Architectural Projects
- Understand the Fundamentals of BIM Methodology
- Selection of Suitable Software
- Team Training on BIM Methodology
- Determination of BIM Protocols and Standards
- Implementing Interdisciplinary Collaboration
- Integration of Building Lifecycle Management
- Evaluation and Continuous Improvement
- The BIM Roles in Architectural Projects
- BIM Manager or Director BIM
- BIM Coordinator
- BIM Modeler
- BIM Specialist
- BIM Consultant
- BIM Standards
- International Level
- National Level
- Sector Level
- Project Level
- Benefits of BIM Methodology: Impact on Clients, Professionals, and Sustainability
- Customer Benefits
- Benefits for Architects
- Benefits for the Constructor
- Benefits for the User
- Social Benefit: Sustainability
- Challenges in the Implementation of BIM Methodology in Architectural Projects
- Change of Mentality
- Updating and Improving Skills
- Investment in Technology
- Effective Integration of Work Teams
- Accurate Definition of Protocols
- Change Management
- Data Quality
- Interoperability
- Considerations on the BIM Dimensions in Architectural Projects
- LoD 100
- LoD 200
- LoD 300
- LoD 400
- LoD 500
- Life Cycle Phases through the Use of BIM in Architectural Projects
- Initiation
- Planning
- Building
- Delivery
- Success Stories for the Application of BIM Management for Architectural Projects.
- House in the orchard - Ramón Esteve Estudio - Alboraya - Valencia - Spain - 2017
- Casa Enseada - National Architecture - Xangri-Lá - Brazil - 2015
- Macquarie University Incubator- Macquarie Park- Architectus - Australia - 2016
- Casa UE- Diana Urgilés &
- Jorge Toledo - Ecuador - 2022
- BIM Integration from Design to Construction
- Resources and Time Optimization
- Focus on Sustainability
- Adaptation to Changes and Flexibility
- Challenges on BIM Management in Architectural Planning
- Formation
- Standardization
- Innovation
- BIM Management Trends in Architectural Projects
- Personalization
- Sustainability
- Digitalization
- BIM Mandates
- BIM Adoption
- BIM Integration
- Virtual and Augmented Reality
- 3D Printing
- Artificial Intelligence
- Internet of Things
- Blockchain
- The Future of BIM and Integration with Artificial Intelligence in Architectural Projects
- Chapter 5
- Sustainable Development and Construction
- Climate and Construction
- Climate Factors
- Geometry and Solar Control
- Thermal Comfort
- Architectural Envelope and Heat Flows
- Flows and Heat Transfer
- Conduction
- Convection
- Radiation
- Evaporation
- Heat Fluxes in Buildings
- Thermal Properties of Building Materials
- U Calculation
- Chapter 6
- Environmental Management through Life Cycle Analysis
- The Challenge of Sustainability in the Construction Industry
- An Evolving Planet
- Accelerated Species Extinction
- Alteration of the Nitrogen Cycle
- Ocean Acidification
- Excessive Freshwater Demands
- Land Use Change
- Excess Phosphorus in the Oceans
- Reduction of the Stratospheric Ozone Layer
- Value of Atmospheric Aerosol Concentration Doubled.
- The Necessary Transition to Sustainability.
- Notes:
- Description based on publisher supplied metadata and other sources.
- Other Format:
- Print version: Avila-Calle, Marco Benigno Sustainable Construction Management Processes
- ISBN:
- 9798895307601
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.