1 option
Available Accelerated Bridge Construction Options for Short Span Bridges / Armin Mehrabi, Ana Torrealba, and Mohammad Abedin.
- Format:
- Book
- Author/Creator:
- Mehrabi, Armin, author.
- Torrealba, Ana, author.
- Abedin, Mohammad, author.
- Language:
- English
- Subjects (All):
- Bridges--Design and construction.
- Bridges.
- Physical Description:
- 1 online resource (318 pages)
- Edition:
- First edition.
- Place of Publication:
- Newcastle upon Tyne, England : Cambridge Scholars Publishing, [2024]
- Summary:
- By employing prefabricated bridge elements and systems, Accelerated Bridge Construction reduces on-site construction time and traffic disruptions, and enhances long-term performance. ABC is particularly advantageous for short-span bridges that are well-suited to standardized prefabrication. In such cases, the entire superstructure and substructure can often be constructed using prefabricated deck elements, modular decks, or systems that span the full bridge width. The construction methods can range from traditional crane installations to Self-Propelled Modular Transport units or slide-in techniques for moving the entire superstructures. This book introduces the concept of ABC and examines its application in the context of short-span bridge construction. It categorizes and details short-span bridges based on various criteria and evaluates the performance of the existing bridges. Decision-making processes regarding the adoption of ABC, choice of elements, systems, and construction methods are also discussed. Additionally, the book covers the inspection of short-span bridges and includes a design example.
- Contents:
- Intro
- Contents
- List of Figures
- List of Tables
- Chapter 1
- Abstract
- Background
- Objectives of the Book
- ABC - Definitions and Descriptions
- Short Span Classification
- Outline of the book
- Chapter 2
- Prefabricated Bridge Elements and Systems (PBES) for Conventional Bridges
- Buried Bridges (20 ft.<
- Span <
- 70ft)
- Culverts (Span<
- 20ft)
- Foundation
- FDOT Review of Superstructure Types Appropriate for Short-Span Bridges
- Chapter 3
- Joints and Connections
- Chapter 4
- Construction Methods
- Chapter 5
- Inspection of ABC bridges
- Inspection Equipment
- Bridge Inspection Forms
- Non-Destructive Testing
- Other Methods
- Evaluation of Substructure for Reuse
- Performance of ABC Technologies to Date
- Chapter 6
- Decision Making for a New Bridge Construction
- Decision Making Tools Developed by Different State DOTs
- Major Parameters Affecting the Selection of ABC bridge Elements and Systems in General
- Determination of Appropriate ABC Methods and Type of Superstructure
- Available Selection Methods and Design Considerations for Substructure
- Life Cycle Cost Analysis as a Tool for Decision Making
- Decision Making for Replacement, Reuse, or Retrofitting/Strengthening of Existing Foundations and Substructures
- How to Use the Decision-Making Guide Provided in This Chapter?
- Chapter 7
- Introduction
- Bridge Description
- Bridge System Selection
- Bridge Design Procedure for ABC
- References.
- Notes:
- Description based on publisher supplied metadata and other sources.
- Description based on print version record.
- Includes bibliographical references.
- ISBN:
- 1-03-640197-9
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.