1 option
Alternate Test Methods for High Pressure Engine Component Testing Wyle Laboratories
- Format:
- Conference/Event
- Author/Creator:
- Mayne, A.W., author.
- Conference Name:
- Aerospace Atlantic Conference & Exposition (1991-04-22 : Dayton, Ohio, United States)
- Language:
- English
- Physical Description:
- 1 online resource
- Place of Publication:
- Warrendale, PA SAE International 1991
- Summary:
- This paper presents an analysis of potential methods for the testing of Space Shuttle Main Engine turbopump assemblies in a modified Component Test Facility at Stennis Space Center. In particular, the test methods will support long-duration (approximately 250 seconds) green run (acceptance) tests. Six potential test methods were considered, including the traditional, fully pressure-fed test method, some test methods involving engine systems, and some test methods involving recirculation of the pump outlet flow, or "bootstrapping." Two of these methods were investigated in sufficient detail to provide ROM cost estimates: the fully pressure-fed method, and one of the bootstrap methods
- Notes:
- Vendor supplied data
- Publisher Number:
- 911125
- Access Restriction:
- Restricted for use by site license
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.