My Account Log in

1 option

Post-Restructure U.S. Laboratory and Habitation Module Configuration for Space Station Freedom Missiles and Space Div., Boeing Defense and Space Group Huntsville, AL

SAE Technical Papers (1906-current) Available online

View online
Format:
Conference/Event
Author/Creator:
Boutros, Ramzy, author.
Conference Name:
International Conference On Environmental Systems (1991-07-08 : San Francisco, California, United States)
Language:
English
Physical Description:
1 online resource
Place of Publication:
Warrendale, PA SAE International 1991
Summary:
AbstractThe Space Station Freedom (SSF) configuration evolved during the past decade in response to changing requirements and resources. Early space station studies determined that an on-orbit U.S. Laboratory (Lab) module was required to accomplish mission goals. A Habitation (Hab) module was needed to support the objective of a permanently manned presence on the station. Operational requirements were met by providing resource nodes, pressurized logistics (Log) elements, and airlocks. These five elements are the basic pressurized building blocks used to construct SSF.As the SSF design matured, requirement changes were made to accommodate such considerations as launch capability, extravehicular activity (EVA) assembly time, intravehicular activity (IVA) outfitting and checkout, and other program resource constraints. These considerations resulted in design changes that were incorporated into a restructured design that will be finalized and become the SSF baseline by mid-1991.The baselined restructured program is planned to be conducted in three phases: (1) a man-tended capability (MTC) phase that provides a U.S. Lab element and node to enable early support of scientific experimentation; (2) a permanently manned capability (PMC) phase with a Hab and an additional node to support four crew members on orbit for 90 days; and (3) the eight-man crew capability (EMCC) phase, which will be implemented when funds becomeavailable. The European and Japanese laboratory elements will be installed at PMC.This paper presents a design overview for each of the three restructured program phases with respect to the U.S. Lab, Hab, and pressurized logistics element topologies. An outline of the capabilities for the primary subsystems is also included. The described configuration summarizes all changes that are approved and incorporated in Restructure through April 1991
Notes:
Vendor supplied data
Publisher Number:
911594
Access Restriction:
Restricted for use by site license

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

Find

Home Release notes

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Find catalog Using Articles+ Using your account