1 option
Secondary Power System Preliminary Design
- Format:
- Conference/Event
- Author/Creator:
- Ullyott, Richard, author.
- Conference Name:
- Aerospace Technology Conference & Exposition (1991-09-23 : Long Beach, California, United States)
- Language:
- English
- Physical Description:
- 1 online resource
- Place of Publication:
- Warrendale, PA SAE International 1991
- Summary:
- Commercial gas turbine auxiliary power unit (APU) requirements are in many respects more demanding than those for propulsion engines of a similar power level. The successful modern APU design must provide high reliability and durability in a flight weight package which also satisfies diverse and often conflicting performance requirements. The preliminary design phase represents the first crucial step towards meeting these objectives. This paper examines how the primary APU requirements influence turbomachinery configuration selection, and then flow down through the preliminary design process into individual APU component and sub-system design criteria, using a load compressor APU example
- Notes:
- Vendor supplied data
- Publisher Number:
- 912189
- Access Restriction:
- Restricted for use by site license
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.