My Account Log in

1 option

Topase: Automation of Airbus Central Wing Subassembly Aerospatiale

SAE Technical Papers (1906-current) Available online

View online
Format:
Conference/Event
Author/Creator:
Lorphelin, Benoit, author.
Conference Name:
Aerofast Conference & Exposition (1990-08-01 : Warrendale, Pennsylvania, United States)
Language:
English
Physical Description:
1 online resource
Place of Publication:
Warrendale, PA SAE International 1990
Summary:
Increased production requirements for the Airbus family of planes, caused Aerospatiales Aircraft Division at Nantes to implement a new automated system. Used for central wing box assembly, this system is called TOPASE. Value analysis was performed to optimize assembly and production schedules. A simulation was performed to identify resource allocation in all workshops based on schedule demand for A320, A330/340 and A321 assemblies. The fundamental principle of this system is to create a homogeneous production flow with no bottlenecks. At the same time, equipment utilization must be maximized to optimize production cost and provide acceptable profits. TOPASE today has a series of identical C.N.C. machines each capable of complete panel assembly in one operation. This includes installation of rivets, double headed slug rivets and two piece fasteners
Notes:
Vendor supplied data
Publisher Number:
902049
Access Restriction:
Restricted for use by site license

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

Find

Home Release notes

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Find catalog Using Articles+ Using your account