My Account Log in

1 option

SMC Heavy Duty Truck Hood; 12 Months From Concept to Production Freightliner Corporation

SAE Technical Papers (1906-current) Available online

View online
Format:
Conference/Event
Author/Creator:
Morrison, Robert W., author.
Conference Name:
SAE International Truck and Bus Meeting and Exposition (1988-11-07 : Indianapolis, Indiana, United States)
Language:
English
Physical Description:
1 online resource
Place of Publication:
Warrendale, PA SAE International 1988
Summary:
Simultaneous engineering techniques have been applied to a SMC truck hood to reduce the lead-time for production introduction from 22 months to 12 months. Several other technologies were also applied to insure a successful product introduction in this reduced timeframe: computer definition of the hood surface for accuracy, RTM prototype tooling for early design tryout and durability testing, Finite Element Analysis to further confirm durability of the hood structure, and brittle lacquer combined with strain gaging to provide life data using a hydraulic road simulator for load inputs
Notes:
Vendor supplied data
Publisher Number:
881860
Access Restriction:
Restricted for use by site license

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Library Catalog Using Articles+ Library Account