1 option
A Design Methodology for Reducing Product Development Lead Time
- Format:
- Conference/Event
- Author/Creator:
- McCord, William Ross, author.
- Conference Name:
- 1983 SAE International Off-Highway and Powerplant Congress and Exposition (1983-09-12 : Milwaukee, Wisconsin, United States)
- Language:
- English
- Physical Description:
- 1 online resource
- Place of Publication:
- Warrendale, PA SAE International 1983
- Summary:
- The need for a foreshortened product development lead time has become a necessity, in today's economy, to the efficient manufacturing of off-highway mining trucks. This paper reviews the approach taken by one noted truck manufacturer. By utilizing finite element analysis, plastic scale modeling techniques, and a comprehensive full scale test facility, the development lead time of the WABCO 100 Ton HAULPAK* was reduced to 60% of that normally required for the development of a new product from conceptual layout to production release
- Notes:
- Vendor supplied data
- Publisher Number:
- 831341
- Access Restriction:
- Restricted for use by site license
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.