1 option
MHD Repowering of a 250 MWe Unit of the TVA Allen Steam Plant The University of Tennessee Space Institute
- Format:
- Conference/Event
- Author/Creator:
- Chapman, J. N., author.
- Conference Name:
- 27th Intersociety Energy Conversion Engineering Conference (1992) (1992-08-03 : San Diego, California, United States)
- Language:
- English
- Physical Description:
- 1 online resource
- Place of Publication:
- Warrendale, PA SAE International 1992
- Summary:
- Coal fired MHD repowering is considered for the TVA Allen Steam Plant. The performance of the repowered plant is presented. Cost comparisons are made of the cost of repowering with MHD versus the cost of meeting similar standards by installing scrubbers and selective catalytic NOx reduction (SCNR). For repowering of a single 250 MWe unit, the costs favor scrubbing and SCNR. If one considers a single repowering of all three 250 MWe units by a single MHD topping cycle and boiler, MHD repowering is more economical. Environmental emissions from the repowered plant are estimated
- Notes:
- Vendor supplied data
- Publisher Number:
- 929286
- Access Restriction:
- Restricted for use by site license
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.