Design Process of Change of Functioning of a Power Shovel to a Lattice Boom Crane of 300-Ton Capacity Perlite Construction Company
- Format:
- Conference/Event
- Author/Creator:
- Bathaee, Bathaee, author.
- Conference Name:
- SAE 2016 Commercial Vehicle Engineering Congress (2016-10-04 : Rosemont, Illinois, United States)
- Language:
- English
- Physical Description:
- 1 online resource
- Place of Publication:
- Warrendale, PA SAE International 2016
- Summary:
- AbstractThe aim of this paper is represented design and manufacturing process of change of functioning of a scrapped shovel (Ruston Bucyrus R32) to a lattice boom crane of 300-ton capacity. Capabilities of the structure, changed components, additional required components (e.g. boom, mast, winch) and modifying critical dimensions of this shovel were surveyed. In this paper, some of the 300-ton capacity lattice boom cranes of various companies were considered and critical dimensions that play an important role in system stability were surveyed. After that, their major dimensions were compared with those of a common shovel. In order to design the structure and components of this shovel-based crane, static, dynamic and wind loads were calculated. Finally, the critical dimensions of the shovel related to chassis and crawler were modified. This crane was used for lifting heavy machineries in the right zone of the main body of Seymareh dam site (Ilam-Iran) and played a vital role on that project
- Notes:
- Vendor supplied data
- Publisher Number:
- 2016-01-8126
- Access Restriction:
- Restricted for use by site license
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.