1 option
Advantages of Simulation Based Reliability Growth Planning US Army TARDEC
- Format:
- Conference/Event
- Author/Creator:
- Kosinski, Kosinski, author.
- Conference Name:
- SAE 2015 World Congress & Exhibition (2015-04-21 : Detroit, Michigan, United States)
- Language:
- English
- Physical Description:
- 1 online resource
- Place of Publication:
- Warrendale, PA SAE International 2015
- Summary:
- AbstractThe current reliability growth planning model used by the US Army, the Planning Model for Projection Methodology (PM2), is insufficient for the needs of the Army. This paper will detail the limitations of PM2 that cause Army programs to develop reliability growth plans that incorporate unrealistic assumptions and often demand that infeasible levels of reliability be achieved. In addition to this, another reliability growth planning model being developed to address some of these limitations, the Bayesian Continuous Planning Model (BCPM), will be discussed along with its own limitations. This paper will also cover a third reliability growth planning model that is being developed which incorporates the advantageous features of PM2 and BCPM but replaces the unrealistic assumptions with more realistic and customizable ones. The internal workings of this new Tank Automotive Research Development and Engineering Center (TARDEC) developed simulation-based model will be delved into with a focus on the advantages this model holds over PM2 and BCPM
- Notes:
- Vendor supplied data
- Publisher Number:
- 2015-01-0439
- Access Restriction:
- Restricted for use by site license
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.