1 option
An Anecdote - Order of Magnitude Cost and Time Reduction in Delivering an Aircraft Manufacturing Solution Bombardier Aerospace
- Format:
- Conference/Event
- Author/Creator:
- Krofchak, Krofchak, author.
- Conference Name:
- SAE 2013 AeroTech Congress & Exhibition (2013-09-24 : Montréal, Canada)
- Language:
- English
- Physical Description:
- 1 online resource
- Place of Publication:
- Warrendale, PA SAE International 2013
- Summary:
- From purchase order to production womb-to-tomb in 5 months tothe day, Bombardier's Fuselage Assembly line was upgraded andmade into a fuselage automated assembly pulse line. This wasaccomplished with a factory move of the assembly line whilemaintaining production of this legacy line without missing oneaircraft. Early in 2012, a bold decision was made to change theplan from a manual process to an automated process and implementedon schedule. This was applying automation to a legacy aircraftassembly line. It worked. Both technology and recurring costsavings will be addressed in this paper
- Notes:
- Vendor supplied data
- Publisher Number:
- 2013-01-2335
- Access Restriction:
- Restricted for use by site license
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.