My Account Log in

1 option

An Anecdote - Order of Magnitude Cost and Time Reduction in Delivering an Aircraft Manufacturing Solution Bombardier Aerospace

SAE Technical Papers (1906-current) Available online

View online
Format:
Conference/Event
Author/Creator:
Krofchak, Krofchak, author.
Contributor:
Mack, Ronald J.
Conference Name:
SAE 2013 AeroTech Congress & Exhibition (2013-09-24 : Montréal, Canada)
Language:
English
Physical Description:
1 online resource
Place of Publication:
Warrendale, PA SAE International 2013
Summary:
From purchase order to production womb-to-tomb in 5 months tothe day, Bombardier's Fuselage Assembly line was upgraded andmade into a fuselage automated assembly pulse line. This wasaccomplished with a factory move of the assembly line whilemaintaining production of this legacy line without missing oneaircraft. Early in 2012, a bold decision was made to change theplan from a manual process to an automated process and implementedon schedule. This was applying automation to a legacy aircraftassembly line. It worked. Both technology and recurring costsavings will be addressed in this paper
Notes:
Vendor supplied data
Publisher Number:
2013-01-2335
Access Restriction:
Restricted for use by site license

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Library Catalog Using Articles+ Library Account