My Account Log in

1 option

Performance Development History-10 kw Turboalternator

SAE Technical Papers (1906-current) Available online

View online
Format:
Conference/Event
Author/Creator:
Rodgers, C., author.
Conference Name:
Aerospace Engineering and Manufacturing Meeting (1974-09-30 : San Diego, California, United States)
Language:
English
Physical Description:
1 online resource
Place of Publication:
Warrendale, PA SAE International 1974
Summary:
The performance development history of a small gas turbine for the U. S. Army 10 kW turboalternator is discussed. The design incorporates a single-stage centrifugal compressor and single-stage radial inflow turbine, mounted back-to-back on a common shaft rotating at 93,500 rpm and directly coupled to a variable frequency solid alternator. Total accumulated running time, at rated speed during development, exceeded 20,000 h; in addition, a 2000 start/stop test was successfully completed. Gas turbine performance was found to be quite sensitive to compressor and turbine clearances as a consequence of the small compressor and turbine blade heights. With accurate control of these clearances, it was possible to attain average engine specific fuel consumptions meeting contract requirements of 1.1 lb/hp·h with a low rated turbine inlet temperature of 1330°F
Notes:
Vendor supplied data
Publisher Number:
740849
Access Restriction:
Restricted for use by site license

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

Find

Home Release notes

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Find catalog Using Articles+ Using your account