1 option
Implementation of New Fasteners Into Production
- Format:
- Conference/Event
- Author/Creator:
- Krezak, John E., author.
- Conference Name:
- National Aerospace Engineering and Manufacturing Meeting (1973-10-16 : Los Angeles, California, United States)
- Language:
- English
- Physical Description:
- 1 online resource
- Place of Publication:
- Warrendale, PA SAE International 1973
- Summary:
- Performance and cost improvements force the development and implementation of new fasteners into production. Total internal company organization participation is essential. Industry cooperation and use can be vital to economic success. Production feasibility tests to establish installation costs and production suitability must be established. These include: cost of inventory of existing on-going system; cost of surplus; tool cost for changeover; floor space required; inventory of parts in process; and cost of installation. Technical solutions should be flexible to minimize personal bias of participants
- Notes:
- Vendor supplied data
- Publisher Number:
- 730903
- Access Restriction:
- Restricted for use by site license
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.