My Account Log in

1 option

Construction Simulation of the Main Earth Dam at Manicouagan 3 Hydro-Quebec

SAE Technical Papers (1906-current) Available online

View online
Format:
Conference/Event
Author/Creator:
Godbout, Serge, author.
Conference Name:
Farm, Construction, Industrial Machinery and Powerplant Meetings (1970-09-14 : Milwaukee, Wisconsin, United States)
Language:
English
Physical Description:
1 online resource
Place of Publication:
Warrendale, PA SAE International 1970
Summary:
This paper describes the computer model developed to simulate construction of the eleven million cu yd gravel dam at Manic 3, and outlines the results obtained. Construction of the dam is a complex task influenced by many random events.Manic 3 is part of Hydro-Quebec's Manicouagan-Outardes hydroelectric development, which will ultimately comprise seven power stations with a combined capacity of 5.5 million kW.Before simulation was introduced, it was extremely difficult to solve the many problems involved in choosing and utilizing equipment, obtaining accurate time and cost estimates, and formulating realistic production schedules
Notes:
Vendor supplied data
Publisher Number:
700566
Access Restriction:
Restricted for use by site license

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Library Catalog Using Articles+ Library Account