My Account Log in

1 option

Floor Drilling Gantry System Boeing Commercial Airplane, Equipment Services

SAE Technical Papers (1906-current) Available online

View online
Format:
Conference/Event
Author/Creator:
Adams, Evert P., author.
Conference Name:
2002 SAE Automated Fastening Conference & Exhibition (2002-10-01 : Chester, United Kingdom)
Language:
English
Physical Description:
1 online resource
Place of Publication:
Warrendale, PA SAE International 2002
Summary:
A new process for the drilling of floor panel fastener and fitting holes, plus the installation of fittings has been developed. The process integrates a Laser Tracker to check and align a floor grid assembly; a two spindle, CNC controlled, gantry drilling system to drill the floor grid assembly; a manual work area for the installation of the fittings and other manual work tasks; and a material handling system to move the floor grid assembly through the system. This system provides a cost reduction when compared to replacement cost of previously used equipment. It moves the drilling process out of the fuselage structure, reducing flow time and cleanup. This paper discusses the process requirements, design, and production results for this system
Notes:
Vendor supplied data
Publisher Number:
2002-01-2625
Access Restriction:
Restricted for use by site license

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

Find

Home Release notes

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Find catalog Using Articles+ Using your account