1 option
C-17 Cargo Ramp and Door Automated Drilling & Fastening System - Project Overview AMR&D, Technology Integration Boeing Military Aircraft and Missile Systems
- Format:
- Conference/Event
- Author/Creator:
- Schaefer, Christian E., author.
- Conference Name:
- 2002 SAE Automated Fastening Conference & Exhibition (2002-10-01 : Chester, United Kingdom)
- Language:
- English
- Physical Description:
- 1 online resource
- Place of Publication:
- Warrendale, PA SAE International 2002
- Summary:
- To further reduce airframe costs associated with fastener installation, an Automated Drilling and Fastening System (ADFS) has been implemented on the C-17 Program to enhance current Mold Line attachment processes. The ADFS will automate up to 90% of all Cargo Ramp and Door Mold Line fastener installations.Implementation of the C-17 ADFS captures a five goal technological approach identified at project onset: 1) Increase the use of automated drilling and fastening equipment, 2) System shall be Numerically Controlled, 3) High speed drilling techniques shall be used, 4) Minimize the use of current tooling, and 5) Design the system to use components common to other Boeing drilling and fastening machines
- Notes:
- Vendor supplied data
- Publisher Number:
- 2002-01-2629
- Access Restriction:
- Restricted for use by site license
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.