1 option
Performance Evaluation of the First AC BIPV Installation in Canada British Columbia Institute of Technology
- Format:
- Conference/Event
- Author/Creator:
- Stamenic, Ljubisav, author.
- Conference Name:
- 34th Intersociety Energy Conversion Engineering Conference (1999-08-02 : Vancouver, Canada)
- Language:
- English
- Physical Description:
- 1 online resource
- Place of Publication:
- Warrendale, PA SAE International 1999
- Summary:
- Initial performance measures and operating experience with a 1 kWp grid-connected array near Vancouver (BC, Canada) demonstrate the viability of AC building integrated photovoltaics (BIPV) module technology. Low current draw by the inverter, and continued operation at very low insolation levels contribute to a performance benefit over small photovoltaic arrays with DC wiring and central inverters. Maximum power point tracking of individual modules is analyzed, and an increase in array power output of between 0.6% and 3.2% is observed when compared with a DC configured photovoltaic array
- Notes:
- Vendor supplied data
- Publisher Number:
- 1999-01-2583
- Access Restriction:
- Restricted for use by site license
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.