1 option
Design Target and Life Cycle Cost Management Through Bearing Value Analysis The Timken Corporation
- Format:
- Conference/Event
- Author/Creator:
- Martens, Mark D., author.
- Conference Name:
- International Off-Highway & Powerplant Congress & Exposition (1999-09-13 : Indianapolis, Indiana, United States)
- Language:
- English
- Physical Description:
- 1 online resource
- Place of Publication:
- Warrendale, PA SAE International 1999
- Summary:
- Traditionally, bearings have been selected on the basis of a calculated fatigue life or price. These are important, but do not represent the entire spectrum of variables that determine a bearing's value. As companies are forced to seek out only the highest value components, a standard methodology is needed to make comparisons (of value).To address these issues, a new procedure has been developed that links bearing selection decisions to a financial analysis by combining advanced bearing life analysis tools, bearing prices, Weibull statistics, financial data, and end-user demographics. Bearing consumption rates, warranty claims, and relative cash flow generated by a bearing-to-bearing comparison are modeled. The input data and calculation methodology will be discussed along with the results and applicability of this process
- Notes:
- Vendor supplied data
- Publisher Number:
- 1999-01-2789
- Access Restriction:
- Restricted for use by site license
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.