My Account Log in

1 option

Thermal Assessment of Swift Instrument Module Thermal Control System during First 2.5 Years in Flight NASA Goddard Space Flight Center

SAE Technical Papers (1906-current) Available online

View online
Format:
Conference/Event
Author/Creator:
Choi, Michael K., author.
Conference Name:
International Conference On Environmental Systems (2007-07-09 : Chicago, Illinois, United States)
Language:
English
Physical Description:
1 online resource
Place of Publication:
Warrendale, PA SAE International 2007
Summary:
On Day 97, 2005, a temperature excursion of the Burst Alert Telescope (BAT) loop heat pipe (LHP) #1 compensation chamber (CC) caused this LHP shut down. It had no impact on the Gamma Ray Burst (GRB) detection because LHP #0 was nominal. After LHP #1 was started up and its primary heat controller was disabled on Day 98, both LHPs have been nominal. On Day 337, 2004, the X-Ray Telescope (XRT) thermo-electric cooler (TEC) power supply (PS) suffered a single point failure. The charge-coupled device (CCD) has been cooled by the radiator passively to -50°C or colder most of the time. The CCD temperature meets the main objective of pinpointing GRB afterglow positions. With these anomalies overcome, the Instrument Module (IM) thermal control system (TCS) is nominal during the first 2.5 years in flight
Notes:
Vendor supplied data
Publisher Number:
2007-01-3083
Access Restriction:
Restricted for use by site license

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Library Catalog Using Articles+ Library Account