My Account Log in

1 option

Biomass Production System (BPS) Technology Validation Test Results Orbital Technologies Corporation

SAE Technical Papers (1906-current) Available online

View online
Format:
Conference/Event
Author/Creator:
Morrow, R. C., author.
Conference Name:
International Conference On Environmental Systems (2004-07-19 : Colorado Springs, Colorado, United States)
Language:
English
Physical Description:
1 online resource
Place of Publication:
Warrendale, PA SAE International 2004
Summary:
The objective of the BPS Technology Validation Test (TVT) flown on the ISS as part of Increment 4 was to verify the functionality of environmental control subsystems and to measure the ability of the BPS to support plant growth and development in microgravity. Additional TVT objectives included validation of information acquisition systems, operations and support systems, and component performance. All TVT objectives were successfully addressed. Most evaluation criteria stipulated pre-flight were met. When there were deviations from pre-mission requirements, root causes were identified and subsystem configurations modified to eliminate these problems. Results from the TVT have been applied to the Plant Research Unit development to reduce technical risks and increase reliability.INTRODUCTION
Notes:
Vendor supplied data
Publisher Number:
2004-01-2460
Access Restriction:
Restricted for use by site license

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Library Catalog Using Articles+ Library Account