2 options
Environmental assessment, reconstruction of Bonnie Clare Road, milepost 0.0 to milepost 7.7 ; reconstruction of Grapevine ranger station parking lot and sidewalks ; and resurfacing Mesquite Spring campground road, milepost 0.0 to milepost 1.9 / National Park Service, Death Valley National Park, California and Nevada.
- Format:
- Book
- Government document
- Author/Creator:
- Death Valley National Park (Agency : U.S.), author.
- Language:
- English
- Subjects (All):
- Death Valley National Park (Calif. and Nev.)--Environmental conditions.
- Death Valley National Park (Calif. and Nev.).
- Roads--Design and construction--Environmental aspects--Death Valley National Park (Calif. and Nev.).
- Roads.
- Natural resources--Death Valley National Park (Calif. and Nev.).
- Natural resources.
- Ecology.
- Roads--Design and construction--Environmental aspects.
- United States--Death Valley National Park.
- Physical Description:
- 1 online resource (2 volumes (150, 76 pages)) : illustrations (some color), color maps
- Other Title:
- Reconstruction of Bonnie Clare Road, milepost 0.0 to milepost 7.7
- Reconstruction of Grapevine ranger station parking lot and sidewalks
- Resurfacing Mesquite Spring campground road, milepost 0.0 to milepost 1.9
- Place of Publication:
- [Denver, Colo.] : National Park Service, United States Department of the Interior, 2012.
- Notes:
- "February 2012"--Page 4 of cover.
- "NPS 143/106325"--Page 4 of cover.
- Includes bibliographical references (pages 145-150).
- Description based on online resource; title from PDF title page (NPS, viewed June 16, 2021).
- Other Format:
- Print version: Environmental assessment
- OCLC:
- 1256667713
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.