My Account Log in

2 options

BPA lower Snake River dams power replacement study / Energy and Environmental Economics, Inc. (E3).

Online

Available online

View online

U.S. Government Documents Available online

View online
Format:
Book
Government document
Author/Creator:
Energy and Environmental Economics, Inc., author.
Contributor:
Energy and Environmental Economics, Inc., author.
United States. Bonneville Power Administration, issuing body.
Language:
English
Subjects (All):
Dams--Snake River (Wyo.-Wash.).
Dams.
Dam retirement--Economic aspects--Snake River (Wyo.-Wash.).
Dam retirement.
Electric power system stability.
Electric power distribution--Northwestern States--Evaluation.
Electric power distribution.
Hydroelectric power plants--Northwestern States.
Hydroelectric power plants.
Electric power distribution--Evaluation.
United States--Northwestern States.
United States--Snake River.
Physical Description:
1 online resource (iv, 49 pages) : color illustrations, color map
Other Title:
Bonneville Power Administration lower Snake River dams power replacement study
Place of Publication:
[Portland, Or.] : [Bonneville Power Administration], 2022.
Notes:
"July 2022."
"E3 was contracted by the Bonneville Power Administration to conduct an independent study of the value of the lower Snake River dams ("LSR dams") to the Northwest power system"--Page 1.
Includes bibliographical references.
Description based on online resource, PDF version; title from title page (BPA, viewed July 18, 2022).
OCLC:
1336937550

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

Find

Home Release notes

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Find catalog Using Articles+ Using your account