2 options
Guidelines for inservice testing at nuclear power plants : inservice testing of pumps and valves and inservice examination and testing of dynamic restraints (snubbers) at nuclear power plants : draft report for comment / prepared by Gurjendra S. Bedi.
Connect to full text Available online
View online- Format:
- Book
- Government document
- Author/Creator:
- Bedi, Gurjendra S.
- Language:
- English
- Subjects (All):
- Nuclear power plants--Piping--Valves.
- Nuclear power plants.
- Nuclear power plants--Shock absorbers.
- Genre:
- technical reports.
- Technical reports
- Technical reports.
- Physical Description:
- 1 online resource ([192] pages) : illustrations
- Other Title:
- Inservice testing of pumps and valves and inservice examination and testing of dynamic restraints (snubbers) at nuclear power plants : draft report for comment
- Place of Publication:
- Washington, D.C. : U.S. Nuclear Regulatory Commission, Office of Nuclear Reactor Regulation, [2011]
- Notes:
- Title from title screen (viewed on May 31, 2012).
- "Date published: August 2011."
- "Manuscript completed: July 2011."
- Includes bibliographical references.
- "NUREG-1482, rev. 2."
- Other Format:
- Print version: Bedi, Gurjendra S. Guidelines for inservice testing at nuclear power plants
- OCLC:
- 794553197
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.