2 options
Ballistic missile defense : DOD needs to address planning and implementation challenges for future capabilities in Europe : report to congressional addressees.
Connect to full text Available online
View online- Format:
- Book
- Government document
- Author/Creator:
- United States. Government Accountability Office
- Language:
- English
- Subjects (All):
- United States. Department of Defense--Planning--Evaluation.
- United States.
- United States. Department of Defense.
- Ballistic missile defenses--Europe--Costs.
- Ballistic missile defenses.
- Ballistic missile defenses--Europe--Planning.
- Ballistic missile defenses--Costs.
- Planning--Evaluation.
- Europe.
- Physical Description:
- 1 online resource (ii, 57 pages) : color illustrations, map
- Other Title:
- DOD needs to address planning and implementation challenges for future capabilities in Europe
- Place of Publication:
- [Washington, D.C.] : U.S. Govt. Accountability Office, [2011]
- Summary:
- In September 2009, the President announced a revised approach for ballistic missile defense (BMD) in Europe. The European Phased Adaptive Approach (EPAA) is designed to defend against existing and near-term ballistic missile threats and build up defenses over four phases as threats mature and new BMD technologies become available. Although the approach will include capabilities such as radars and land and sea-based BMD assets, the Department of Defense (DOD) has not yet established EPAA life-cycle costs. EPAA is DOD's first implementation of its new, regional approach to BMD. GAO was asked to evaluate DOD's plans for implementing EPAA. GAO reviewed the extent to which: (1) DOD has developed guidance and addressed management of cost and schedule for EPAA, and (2) DOD planning for EPAA is informed by operational performance data. GAO reviewed key legislation, policy and guidance, and initial plans for implementation and asset allocation. GAO recommends that DOD provide guidance on EPAA end states; develop EPAA life-cycle cost estimates; and integrate its phase schedule with acquisition, infrastructure, and personnel activities. GAO also recommends that DOD adopt operational performance metrics and include them in the BMD test program. DOD generally concurred with GAO's recommendations.
- Notes:
- Title from cover screen (viewed Jan. 27, 2011).
- "January 2011."
- Includes bibliographical references.
- "GAO-11-220."
- OCLC:
- 698512486
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.