My Account Log in

2 options

Field performance of timber bridges. 4, Graves Crossing stress-laminated deck bridge / James P. Wacker, Michael A. Ritter.

Online

Available online

View online

U.S. Government Documents Available online

View online
Format:
Book
Government document
Author/Creator:
Wacker, James P., author.
Ritter, Michael A., author.
Contributor:
Forest Products Laboratory (U.S.), issuing body.
Series:
Research paper FPL-RP ; 539.
Research paper FPL-RP ; 539
Language:
English
Subjects (All):
Wooden bridges--Michigan--Antrim County--Evaluation.
Wooden bridges.
Wooden bridges--Inspection--Michigan--Antrim County.
Wooden bridges--Inspection.
Wooden bridges--Evaluation.
Michigan--Antrim County.
Physical Description:
1 online resource (17 pages) : illustrations, maps.
Other Title:
Graves Crossing stress-laminated deck bridge
Place of Publication:
Madison, WI : United States Department of Agriculture, Forest Service, Forest Products Laboratory, 1995.
Summary:
The Graves Crossing bridge was constructed October 1991 in Antrim County, Michigan, as part of the demonstration timber bridge program sponsored by the USDA Forest Service. The bridge is a two-span continuous, stress-laminated deck superstructure and it is 36-ft long and 26-ft wide. The bridge is one of the first stress-laminated deck bridges to be built of sawn lumber treated with chromated copper arsenate (CCA) preservative. The performance of the bridge was continuously monitored for 2 years, beginning at the time of installation. This performance monitoring involved gathering and evaluating data relative to the stiffness of the lumber laminations, the moisture content of the wood deck, the force level in the stressing bars, and the behavior of the bridge under static truck loading. In addition, comprehensive visual inspections were conducted to assess the overall condition of the structure. Based on 2 years of field observations, the bridge is performing well with no structural or serviceability deficiencies.
Notes:
"June 1995"--Page 2 of cover.
Includes bibliographical references (page 15).
Electronic reproduction. [S.l.] : HathiTrust Digital Library, 2010.
Description based on online resource, PDF version; title from cover (USFS, viewed July 15, 2019).
Other Format:
Print version: Wacker, James P. Field performance of timber bridges. 4, Graves Crossing stress-laminated deck bridge
OCLC:
681938848
Access Restriction:
Use copy Restrictions unspecified

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

Find

Home Release notes

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Find catalog Using Articles+ Using your account