My Account Log in

2 options

Field performance of timber bridges. 12, Christian Hollow stress-laminated box-beam bridge / James P. Wacker, Stephen C. Catherman, Richard G. Winnett.

Online

Available online

View online

U.S. Government Documents Available online

View online
Format:
Book
Government document
Author/Creator:
Wacker, James P., author.
Catherman, Stephen C., author.
Winnett, Richard G., author.
Contributor:
Forest Products Laboratory (U.S.), issuing body.
National Wood in Transportation Information Center (U.S.), issuing body.
United States. Federal Highway Administration
Series:
Research paper FPL-RP ; 560.
Research paper FPL-RP ; 560
Language:
English
Subjects (All):
Wooden bridges--New York (State)--Steuben County--Evaluation.
Wooden bridges.
Wooden bridges--Inspection--New York (State)--Steuben County.
Wooden bridges--Inspection.
Wooden bridges--Evaluation.
New York (State)--Steuben County.
Physical Description:
1 online resource (17 pages) : illustrations (some color), maps.
Other Title:
Christian Hollow stress-laminated box-beam bridge
Place of Publication:
Madison, WI : United States Department of Agriculture, Forest Service, Forest Products Laboratory ; [Morgantown, W. Va.] : National Wood in Transportation Information Center, 1998.
Summary:
In January 1992, the Christian Hollow bridge was constructed in Steuben County, New York. The bridge is a single-span, stress-laminated box-beam superstructure that is 9.1 m long, 9.8 m wide, and 502 mm deep (30 ft long, 32 ft wide, and 19-3/4 in. deep). The performance of the bridge was continuously monitored for 28 months, beginning shortly after installation. Performance monitoring involved gathering and analyzing data relative to the wood moisture content, force level in the stressing bars, vertical bridge creep, and behavior under static load conditions. In addition, comprehensive visual inspections were conducted to assess the condition of the overall structure. Based on field evaluations, the bridge is performing well with no structural or serviceability deficiencies.
Notes:
"January 1998"--Page 2 of cover.
"In cooperation with the United States Department of Transportation, Federal Highway Administration."
Includes bibliographical references (page 16).
Electronic reproduction. [S.l.] : HathiTrust Digital Library, 2010.
Description based on online resource, PDF version; title from cover (USFS, viewed July 11, 2019).
Other Format:
Print version: Wacker, James P. Field performance of timber bridges. 12, Christian Hollow stress-laminated box-beam bridge
OCLC:
679617723
Access Restriction:
Use copy Restrictions unspecified

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Library Catalog Using Articles+ Library Account