2 options
Contract delays led to cost overruns for the Kabul power plant and sustainability remains a key challenge / Office of the Special Inspector General for Afghanistan Reconstruction.
- Format:
- Book
- Government document
- Author/Creator:
- United States. Office of the Special Inspector General for Afghanistan Reconstruction
- Series:
- United States. Office of the Special Inspector General for Afghanistan Reconstruction. SIGAR audit ; 10-6.
- SIGAR audit ; 10-6
- Language:
- English
- Subjects (All):
- Diesel electric power-plants--Afghanistan--Kabul.
- Diesel electric power-plants.
- Electric power--Afghanistan.
- Electric power.
- Economic assistance, American--Afghanistan--Evaluation.
- Economic assistance, American.
- Economic assistance, American--Evaluation.
- Afghanistan.
- Afghanistan--Kabul.
- Physical Description:
- 1 online resource (iii, 22 pages) : color illustrations.
- Other Title:
- Contactor performance and oversight
- Place of Publication:
- Arlington, VA : Office of the Special Inspector General for Afghanistan Reconstruction, [2010]
- Summary:
- This report presents the results of our review of U.S. assistance to the Government of the Islamic Republic of Afghanistan to construct the 105 megawatt Kabul Power Plant at a total cost of more than $300 million. This report updates and builds upon the audit report issued by the Office of the Inspector General of the U.S. Agency for International Development (USAID) in November 2009, which provided a number of recommendations designed to improve the management of the Kabul Power Plant contract. In addition to the concerns raised by the Office of the USAID Inspector General, we are concerned that the long-term sustainability of the plant could be compromised by the decision to build a dual fuel plant that is capable of running on diesel or heavy fuel oil. The use of heavy fuel oil requires a level of technical knowledge and sophistication which may prove difficult for the Afghans to achieve, with no clear economic benefit compared to running the plant exclusively on diesel fuel. In line with this concern, this report includes a recommendation to USAID to help ensure the project is maintained in a sustainable manner.
- Notes:
- Title from title screen (viewed May 9, 2011).
- "January 20, 2010."
- Includes bibliographical references.
- OCLC:
- 501200828
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.