Defense acquisitions : Navy faces challenges constructing the aircraft carrier Gerald R. Ford within budget : report to the Ranking Minority Member, Subcommittee on Seapower and Expeditionary Forces, Committee on Armed Services, House of Representatives.

Online

Available online

View online

U.S. Government Documents Available online

View online
Format:
Book
Government document
Author/Creator:
United States. Government Accountability Office
Contributor:
Francis, Paul L.
Zuckerstein, Karen.
Beradi, Lisa L.
Moldafsky, Diana.
Schwartz, Moshe.
Weir, Alyssa.
United States. Congress. House. Committee on Armed Services. Seapower and Expeditionary Forces Subcommittee
Language:
English
Subjects (All):
United States. Navy--Procurement.
United States.
United States. Navy--Appropriations and expenditures.
United States. Navy.
Aircraft carriers--Cost control.
Aircraft carriers.
Armed Forces--Appropriations and expenditures.
Armed Forces--Procurement.
Physical Description:
ii, 52 pages : digital, PDF file
Other Title:
Navy faces challenges constructing the aircraft carrier Gerald R. Ford within budget
Place of Publication:
[Washington, D.C.] : U.S. Govt. Accountability Office, [2007]
Summary:
As a result of a substantial investment of time and money, the Navy has reduced the risks associated with a number of essential technologies, including the nuclear propulsion and electric plant. At this time, several technical risks that could lead to increased construction costs and potentially result in capability reductions still remain. In particular, the electromagnetic aircraft launch system (EMALS), the advanced arresting gear, and the dual band radar face key tests with little margin for resolving problems before they begin to disrupt the optimal CVN 78 construction schedule and increase ship costs. If key systems arrive late, more labor cost may be incurred because of inefficient work-arounds and schedule delays. EMALS and the advanced arresting gear are vital to meeting key capabilities and must be delivered to the shipyard on time to maintain the construction schedule. The dual band radar enables a smaller island structure on the deck of the carrier, facilitating the ship s increased sortie generation rate. All three systems have experienced schedule delays because of technical and other challenges. Demanding tests lay ahead for all three systems: " In November 2007, the EMALS program will begin testing a production-representative system, including a critical generator component that will be field-tested for the first time." Land-based testing of a dual band radar prototype is expected to begin in December 2008, but will not demonstrate full power output critical to meeting requirements. Specific testing has not yet been planned for all carrier-unique capabilities, including a number of air traffic control scenarios." Testing of the advanced arresting gear, including, for the first time, the software control system, is scheduled to begin in 2008.
Notes:
Title from title screen (viewed May 13, 2008).
"August 2007."
Paper version available from: U.S. Govt. Accountability Office, 441 G St., NW, Rm. LM, Washington, D.C. 20548.
Includes bibliographical references.
"GAO-07-866."
OCLC:
227952930
Access Restriction:
APPROVED FOR PUBLIC RELEASE.

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

Find

Home Release notes

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Find catalog Using Articles+ Using your account