My Account Log in

1 option

Building Case Study 6 - Theatre Reconstruction: Savoy Theatre, London. Part 2 / [presented by] William Whitfield (Whitfield Partners), David Lyle (Whitfield Partners), David Walsh (Whitfield Partners), Red Mason (Whitfield Partners), Clive Shippen (Shippen French Partnership), Duncan Campbell (Max Fordham & Partners), John Clarke (Bucknall Austin), Jerry Godden (Theatre Projects), Gary Pearce (Bovis Construction) & Julian Courtenay (Savoy Theatre).

Pidgeon Digital Available online

View online
Format:
Video
Contributor:
Whitfield, William (Architect), speaker.
Lyle, David (Architect), speaker.
Walsh, David (Architect), speaker.
Mason, Red (Architect), speaker.
Shippen, Clive, speaker.
Campbell, Duncan (Architect), speaker.
Clarke, John (Architect), speaker.
Godden, Jerry, speaker.
Pearce, Gary (Architect), speaker.
Courtenay, Julian, speaker.
Language:
English
Subjects (All):
Savoy Theatre (London, England).
Art deco (Architecture).
Architecture, Modern--20th century.
Architecture, Modern.
Local Subjects:
Savoy Theatre (London, England).
Physical Description:
1 online resource (1 video file (28 minutes)): sound, color
Other Title:
Savoy Theatre
Place of Publication:
London, England : Pidgeon Digital, 1993.
Summary:
On 12 February 1990 the Savoy Theatre in London burned down and, as far as the auditorium was concerned, it was almost a total loss. The decision was taken to recreate this Art Deco theatre exactly as it had been before the fire, that is in the form it had taken in 1929. In the recording, the members of the design team with the contractor and other consultants discuss the enormous difficulties this involved, and the pros and cons of having chosen a management contract for such a job. Together they provide an invaluable lesson in what can be involved in the restoration of a listed building of great complexity.
Contents:
Dress Circle & Soffit Of Upper Circle
Section Showing Proposed Offices
Section With Leisure Centre
Procurement Package Programme
Steelwork
Architectural Ironwork
Seating
Fibrous Plaster Flanking The Stage
Fibrous Plaster From Entrance Foyer
Fibrous Plaster In Dress Circle
Fibrous Plaster In Upper Circle Bar
Exit Sign In Auditorium
Unfinished Ceiling In Embankment Foyer
Balcony Front. Sketch
Carting Lane
Cladding At Roof Level
Roof Level Under Construction
Auditorium Before Fire
Leisure Centre & Pool
Column Structure Seen In Carting Lane
Elevation To Carting Lane
Longitudinal Section
The Auditorium
Main Entrance In Savoy Court.
Notes:
Recorded in 1993.
Title from publisher's website (viewed March 20, 2025).
Access Restriction:
Restricted for use by site license.

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

Find

Home Release notes

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Find catalog Using Articles+ Using your account