1 option
Options for reducing costs in the United Kingdom's future aircraft carrier (CVF) programme / John F. Schank [et al.].
- Format:
- Book
- Government document
- Language:
- English
- Subjects (All):
- Aircraft carriers--Great Britain--Design and construction.
- Aircraft carriers.
- Aircraft carriers--Great Britain--Costs.
- Great Britain. Ministry of Defence--Procurement.
- Great Britain.
- Physical Description:
- 1 online resource (xxvii, 184 pages) : illustrations
- Place of Publication:
- Santa Monica, CA : RAND Corporation, 2005.
- Summary:
- In 2012 and 2015, respectively, the United Kingdom's Ministry of Defence (MOD) will replace its three Invincible-class aircraft carriers with two Future Aircraft Carriers (CVFs), the largest ships ever constructed for the Royal Navy. In preparation for this project, the MOD asked RAND to look at the economic implications, schedule impact, and technical risks of adopting new technologies and alternative manufacturing options. The research described in this report, based on the design and manning data available at the time, focuses on possible reductions in whole-life costs and manpower requirements of the carriers. Concerning reduced acquisition costs-based on figures from various cost analysis models-the researchers suggest options such as using construction practices from the commercial shipbuilding industry plus commercial systems and equipment in place of military standard equipment wherever there is no adverse impact on operations or safety. Regarding personnel cost savings and complement-reducing initiatives, the researchers look towards the practices of private-sector shipbuilding companies and of navies around the globe. Based on this analysis, they recommend, for example, promoting a cross-trained workforce with broad skills and using civilians to augment the ship's crew for nonwarfare responsibilities. Options for reducing the complement examine the trade-offs of increased up-front investments in technology with the corresponding manpower reductions. As the CVF Integrated Project Team continues to explore its many options, the researchers remain optimistic that, given several factors indicated, the CVF's targets can be reached.
- Contents:
- Introduction Cost Analysis Tools Acquisition Cost Savings Minimising Annual Support Costs Contractor Logistics Support Estimating the CVF Complement Complement-Reducing Initiatives on Other Platforms Identifying and Evaluating Complement Reduction Options Summary
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.