My Account Log in

1 option

Building Case Study 3 - Museum: Museum Of The Moving Image, London. Part 1 / [presented by] Bryan Avery (Avery Associates) & John Dawson (Job Architect).

Pidgeon Digital Available online

View online
Format:
Sound recording
Contributor:
Avery, Bryan, narrator.
Hardcastle, Leslie, narrator.
Rees, Peter Wynne, narrator.
Case, John, (architect), narrator.
Gwatkin, Howard, narrator.
Stevens, David, (architect), narrator.
Chatfield, Les, (architect), narrator.
Language:
English
Subjects (All):
Architecture, Modern--20th century.
Architecture, Modern.
Architectural design--Great Britain.
Architectural design.
Physical Description:
1 online resource (1 audio file (32 minutes)).
Place of Publication:
London, England: Pidgeon Digital, 1993.
Summary:
Taking part in this discussion were: • Client: Leslie Hardcastle (Curator, MOMI/British Film Institute) • Architect: Bryan Avery (Avery Associates), John Dawson (Job Architect) • Planner: Peter Rees (City Planning Officer, City of London Corporation) • Structural Engineer: Alan Jones (YRM/Anthony Hunt Associates) • Services Engineer: John Case (Voce Case & Partners) • Acoustics: Howard Gwatkin (Bickerdike Allen Partners) • Quantity Surveyor: David Stevens (Northcroft Neighbour & Nicholson) • Management Contractor: Les Chatfield (Divisional Managing Director, Bovis Construction Ltd.) Everyone present agreed that this job was extremely difficult. The site was under Waterloo Bridge, to which nothing was to be connected. It was difficult to find space for foundations. There was no brief for the architects to work to. Funding had to be raised as the building grew. And so on. Despite everything, this attractive and popular film museum, an extension to the National Film Theatre, revealed itself in 1989. Its story is told in the recording, which was made in the National Film Theatre (hence "noises off").
Contents:
The Museum & Waterloo Bridge
An Early Proposal By Avery
The Hollywood Studio Gallery A. The Road To Be Closed
The Site As Given
Early Sketches By Avery
Enclosed Open Space
The Original Situation
The Building Under Construction
The Car Park
Sketch Exploring Separation Of Structure & Bridge (See Also Chapter 17)
Ground Floor Plan
Cross Section
Exploratory Sketches
Steelwork Independent Of Bridge (See Also Chapter 12)
Glazing At North End. Drawing & Photo
Long Section
First Floor Plan
Ramp For Disabled
Fire Escape. View & Sketch
Discussion Sketches By Leslie Hardcastle
Early Drawing Of Elevation.
Notes:
Title from publisher's website (viewed April 16, 2021).
Access Restriction:
Restricted for use by site license.

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Library Catalog Using Articles+ Library Account