Chemical and process plant commissioning handbook : a practical guide to plant system and equipment installation and commissioning / Martin Killcross.

Knovel Civil Engineering & Construction Materials Academic Available online

View online
Format:
Book
Author/Creator:
Killcross, Martin, author.
Language:
English
Subjects (All):
Chemical plants--Design and construction--Standards.
Chemical plants.
Building commissioning--Handbooks, manuals, etc.
Building commissioning.
Physical Description:
1 online resource (536 pages) : illustrations
Edition:
2nd ed.
Place of Publication:
Oxford, England ; Cambridge, Massachusetts : Elsevier, [2021]
Summary:
Chemical and Process Plant Commissioning Handbook: A Practical Guide to Plant System and Equipment Installation and Commissioning, Second Edition, winner of the 2012 Basil Brennan Medal from the Institution of Chemical Engineers, is a guide to converting a newly constructed plant or equipment into a fully integrated and operational process unit.
Contents:
Intro
Chemical and Process Plant Commissioning Handbook: A Practical Guide to Plant System and Equipment Installation and Commis ...
Copyright
Contents
About the author
Acknowledgments
What is commissioning?
Dry commissioning
Wet commissioning
Inactive commissioning
Active commissioning
HSE advice on commissioning
Main phases of commissioning
Safety and environmental considerations
A simplified commissioning logic
Intent and use of the handbook
The commissioning approach
The commissioning phases
Prepare
Implement
Closeout
Section 1: Commissioning phase one-Prepare
Chapter 1: Appointing Commissioning Manager
Main attributes of a Commissioning Manager
Main responsibilities of a Commissioning Manager
Main qualifications of a Commissioning Manager
Key points
Chapter 2: Commissioning scope
Commissioning scope development-The client Commissioning Manager
Commissioning scope development-Contracting Commissioning Manager (not client employed-delivering a contractual commissioni ...
Commissioning scope-``things that can go wrong´´
Chapter 3: Contracts
Contract considerations for completion and handover from construction to commissioning
Contract considerations for commissioning delivery
Contract considerations for training
Contract considerations for roles and responsibilities
Chapter 4: Commissioning in highly regulated industries-A guide
Office of Nuclear Regulation guidelines on commissioning
Chapter 5: Budget estimation
Commissioning budget estimation-Key elements
Chapter 6: Prioritized asset systemization
Guidelines for commissioning systemization
A sample prioritized commissioning system list
Hypothetical highlighted P&amp
ID showing system identification.
Prioritized asset systemization-``things that can go wrong´´
Chapter 7: Support design
Potential plant issues identified at design reviews are as follows:
Commissioning considerations at a hazard study
Commissioning considerations at layout reviews
Commissioning considerations at P&amp
ID reviews
The process
Mechanical issues
Control, instrument, and electrical issues
General issues
Commissioning considerations at 3-D model reviews
Commissioning considerations while reviewing isometric drawings
Commissioning considerations of risk assessments and Hazards during Construction
Commissioning considerations for control systems
Commissioning considerations for action upon alarm reviews
Support design-``things that can go wrong´´
Chapter 8: Develop an initial commissioning plan, philosophy, and strategy
Commissioning philosophy or plan
Purpose of the commissioning plan
Commissioning overview
Project scope of work
Key project objectives and aims
Commissioning team roles
Commissioning methodology
Initial commissioning systems
The commissioning system file
A sample table of contents for a commissioning system file
Commissioning and start-up challenges
Commissioning strategy
Introduction
Prioritized systems list
Scope of Factory Acceptance Testing (FAT)
Pre- and wet-commissioning phases
Simulated commissioning
Process fluid commissioning
Performance testing
Temporary equipment
Consumables
Vendor and licensor commissioning
Assumptions
Other considerations
Chapter 9: Commissioning risk management
Safe execution of commissioning activities-Point of work and specific risk analysis
Commissioning point of work Risk Assessment guide word considerations
Procedural assessment of risk.
Safety system testing
General commissioning risk evaluation and management-The commissioning contribution to project-related risk
List of considerations in compiling a Commissioning Risk Register
Chapter 10: Appointment and composition of the commissioning team, roles, responsibilities, organization chart, and inter ...
Descriptions of typical commissioning team roles and responsibilities
The Commissioning Manager
Commissioning System Engineer/Area Commissioning Manager
Control/Electrical/Instrumentation Commissioning Engineer
Mechanical Commissioning Engineer
Standard Operating Procedure group-If not in scope of the Commissioning Engineer
Training group-If not in scope of the Commissioning Engineer
Commissioning Safety Adviser
Commissioning Planner
Building Services Engineer
Integration Manager
Operations/Maintenance Liaison
Vendor Coordinator
Roles and responsibilities matrix
Stakeholder management
Interview considerations-Questions useful in the selection of commissioning staff
Typical interview questions for commissioning staff
Chapter 11: Suitably Qualified and Experienced Personnel (SQEP) for commissioning
Job description
Resume or curriculum vitae
Induction process
SQEP assessment
Authority to commission certificate
Chapter 12: Documentation and sign-off requirements required for commissioning preparation
Typical list of documentation commonly stored in the commissioning team library.
Typical list of documentation commonly used by the commissioning team.
Documentation sign-off
Chapter 13: Devise assignment details, site and office requirements, consumables and procure commissioning chemicals
Common considerations when developing foreign commissioning assignments
Site and office requirements.
Commissioning office requirements
List of commonly used commissioning consumables
List and procure commissioning chemicals
Typical list of first fill commissioning chemicals and lubricants
Chapter 14: Create commissioning documents and the system file
Commissioning documents
Engineering documents used by the commissioning team
Typical topics for consideration when drafting commissioning procedures
Considerations for civil's commissioning
General System File
HSE guidance (United Kingdom) on commissioning documentation considerations
Description of contents in a typical commissioning documentation system file
Table of contents
Commissioning file structure
Create commissioning documents and the system file-``things that can go wrong´´
Chapter 15: Control, instrument, and electrical commissioning document preparation
Electrical, control, and instrumentation documents prepared during commissioning
Main electrical installation, switchgear, transformers, motor control centers (MCC), and power cables
Lighting and small power
Control systems (DCS and/or PLC)
Various instrument and electrical cabling including identification labels and tags
Instrument calibration and instrument range consistency
Existing equipment sanity check
Loop test paperwork development, checking, and testing
Motor checking and testing
Software interlock and emergency shut-down testing, both ``dry´´ and ``wet´´
DCS/PLC sequence checking and testing
Specialist vendor installation including vendor package checks including ``as installed´´ paperwork and drawings
Protocol for change management through the commissioning effort
Air conditioning (HVAC) for various rooms and cabinets
Training.
Final checkout and lockdown protocols for all control and electrical systems prior to start-up
Attendance of and paperwork check of all C/E/I-related Site Acceptance Tests (SAT)
Earth leakage testing or protective conductor current testing
Earthing or grounding packages
Control, instrument, electrical commissioning document preparation-``things that can go wrong´´
Chapter 16: Mechanical commissioning document preparation
Mechanical documents prepared during commissioning
Isometric (ISO) drawing to P&amp
ID sanity check
Pipeline cleanliness checks and procedures
Construction and installation checks
Vessel and equipment checks (off- and on site)
Mechanical documentation check
Vendor and proprietary equipment checkout
Lubrication
Alignment checks
Preservation checks
Training
Stores
Mechanical commissioning document preparation-``things that can go wrong´´
Things that can go right!
Chapter 17: Develop training materials
Typical engineering documents utilized during drafting of training packages
Operator knowledge training-Classroom
Operator knowledge training-Vendor presentation
Operator practical training-``On The Job´´
Maintenance personnel knowledge training-Classroom
Maintenance and operator personnel equipment-related training-Workshop and classroom
Management training-Classroom
Control system, operator training-Classroom with control system simulation
Control system, systems engineer training-Typically control system vendor location (potentially site-based)
Develop training materials-``things that can go wrong´´
Chapter 18: Develop Standard Operating Procedures (SOPs)
From the Health and Safety Executive (HSE)-Commissioning guidelines
Status of guidance
Operating procedures.
Title of procedure manual Standard Operating Procedure.
Notes:
Includes index.
Description based on print version record.
Description based on publisher supplied metadata and other sources.
ISBN:
0-323-85141-X
OCLC:
1243542627

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Library Catalog Using Articles+ Library Account