1 option
Chemical and process plant commissioning handbook : a practical guide to plant system and equipment installation and commissioning / Martin Killcross.
- Format:
- Book
- Author/Creator:
- Killcross, Martin, author.
- Language:
- English
- Subjects (All):
- Chemical plants--Design and construction--Standards.
- Chemical plants.
- Building commissioning--Handbooks, manuals, etc.
- Building commissioning.
- Physical Description:
- 1 online resource (536 pages) : illustrations
- Edition:
- 2nd ed.
- Place of Publication:
- Oxford, England ; Cambridge, Massachusetts : Elsevier, [2021]
- Summary:
- Chemical and Process Plant Commissioning Handbook: A Practical Guide to Plant System and Equipment Installation and Commissioning, Second Edition, winner of the 2012 Basil Brennan Medal from the Institution of Chemical Engineers, is a guide to converting a newly constructed plant or equipment into a fully integrated and operational process unit.
- Contents:
- Intro
- Chemical and Process Plant Commissioning Handbook: A Practical Guide to Plant System and Equipment Installation and Commis ...
- Copyright
- Contents
- About the author
- Acknowledgments
- What is commissioning?
- Dry commissioning
- Wet commissioning
- Inactive commissioning
- Active commissioning
- HSE advice on commissioning
- Main phases of commissioning
- Safety and environmental considerations
- A simplified commissioning logic
- Intent and use of the handbook
- The commissioning approach
- The commissioning phases
- Prepare
- Implement
- Closeout
- Section 1: Commissioning phase one-Prepare
- Chapter 1: Appointing Commissioning Manager
- Main attributes of a Commissioning Manager
- Main responsibilities of a Commissioning Manager
- Main qualifications of a Commissioning Manager
- Key points
- Chapter 2: Commissioning scope
- Commissioning scope development-The client Commissioning Manager
- Commissioning scope development-Contracting Commissioning Manager (not client employed-delivering a contractual commissioni ...
- Commissioning scope-``things that can go wrong´´
- Chapter 3: Contracts
- Contract considerations for completion and handover from construction to commissioning
- Contract considerations for commissioning delivery
- Contract considerations for training
- Contract considerations for roles and responsibilities
- Chapter 4: Commissioning in highly regulated industries-A guide
- Office of Nuclear Regulation guidelines on commissioning
- Chapter 5: Budget estimation
- Commissioning budget estimation-Key elements
- Chapter 6: Prioritized asset systemization
- Guidelines for commissioning systemization
- A sample prioritized commissioning system list
- Hypothetical highlighted P&
- ID showing system identification.
- Prioritized asset systemization-``things that can go wrong´´
- Chapter 7: Support design
- Potential plant issues identified at design reviews are as follows:
- Commissioning considerations at a hazard study
- Commissioning considerations at layout reviews
- Commissioning considerations at P&
- ID reviews
- The process
- Mechanical issues
- Control, instrument, and electrical issues
- General issues
- Commissioning considerations at 3-D model reviews
- Commissioning considerations while reviewing isometric drawings
- Commissioning considerations of risk assessments and Hazards during Construction
- Commissioning considerations for control systems
- Commissioning considerations for action upon alarm reviews
- Support design-``things that can go wrong´´
- Chapter 8: Develop an initial commissioning plan, philosophy, and strategy
- Commissioning philosophy or plan
- Purpose of the commissioning plan
- Commissioning overview
- Project scope of work
- Key project objectives and aims
- Commissioning team roles
- Commissioning methodology
- Initial commissioning systems
- The commissioning system file
- A sample table of contents for a commissioning system file
- Commissioning and start-up challenges
- Commissioning strategy
- Introduction
- Prioritized systems list
- Scope of Factory Acceptance Testing (FAT)
- Pre- and wet-commissioning phases
- Simulated commissioning
- Process fluid commissioning
- Performance testing
- Temporary equipment
- Consumables
- Vendor and licensor commissioning
- Assumptions
- Other considerations
- Chapter 9: Commissioning risk management
- Safe execution of commissioning activities-Point of work and specific risk analysis
- Commissioning point of work Risk Assessment guide word considerations
- Procedural assessment of risk.
- Safety system testing
- General commissioning risk evaluation and management-The commissioning contribution to project-related risk
- List of considerations in compiling a Commissioning Risk Register
- Chapter 10: Appointment and composition of the commissioning team, roles, responsibilities, organization chart, and inter ...
- Descriptions of typical commissioning team roles and responsibilities
- The Commissioning Manager
- Commissioning System Engineer/Area Commissioning Manager
- Control/Electrical/Instrumentation Commissioning Engineer
- Mechanical Commissioning Engineer
- Standard Operating Procedure group-If not in scope of the Commissioning Engineer
- Training group-If not in scope of the Commissioning Engineer
- Commissioning Safety Adviser
- Commissioning Planner
- Building Services Engineer
- Integration Manager
- Operations/Maintenance Liaison
- Vendor Coordinator
- Roles and responsibilities matrix
- Stakeholder management
- Interview considerations-Questions useful in the selection of commissioning staff
- Typical interview questions for commissioning staff
- Chapter 11: Suitably Qualified and Experienced Personnel (SQEP) for commissioning
- Job description
- Resume or curriculum vitae
- Induction process
- SQEP assessment
- Authority to commission certificate
- Chapter 12: Documentation and sign-off requirements required for commissioning preparation
- Typical list of documentation commonly stored in the commissioning team library.
- Typical list of documentation commonly used by the commissioning team.
- Documentation sign-off
- Chapter 13: Devise assignment details, site and office requirements, consumables and procure commissioning chemicals
- Common considerations when developing foreign commissioning assignments
- Site and office requirements.
- Commissioning office requirements
- List of commonly used commissioning consumables
- List and procure commissioning chemicals
- Typical list of first fill commissioning chemicals and lubricants
- Chapter 14: Create commissioning documents and the system file
- Commissioning documents
- Engineering documents used by the commissioning team
- Typical topics for consideration when drafting commissioning procedures
- Considerations for civil's commissioning
- General System File
- HSE guidance (United Kingdom) on commissioning documentation considerations
- Description of contents in a typical commissioning documentation system file
- Table of contents
- Commissioning file structure
- Create commissioning documents and the system file-``things that can go wrong´´
- Chapter 15: Control, instrument, and electrical commissioning document preparation
- Electrical, control, and instrumentation documents prepared during commissioning
- Main electrical installation, switchgear, transformers, motor control centers (MCC), and power cables
- Lighting and small power
- Control systems (DCS and/or PLC)
- Various instrument and electrical cabling including identification labels and tags
- Instrument calibration and instrument range consistency
- Existing equipment sanity check
- Loop test paperwork development, checking, and testing
- Motor checking and testing
- Software interlock and emergency shut-down testing, both ``dry´´ and ``wet´´
- DCS/PLC sequence checking and testing
- Specialist vendor installation including vendor package checks including ``as installed´´ paperwork and drawings
- Protocol for change management through the commissioning effort
- Air conditioning (HVAC) for various rooms and cabinets
- Training.
- Final checkout and lockdown protocols for all control and electrical systems prior to start-up
- Attendance of and paperwork check of all C/E/I-related Site Acceptance Tests (SAT)
- Earth leakage testing or protective conductor current testing
- Earthing or grounding packages
- Control, instrument, electrical commissioning document preparation-``things that can go wrong´´
- Chapter 16: Mechanical commissioning document preparation
- Mechanical documents prepared during commissioning
- Isometric (ISO) drawing to P&
- ID sanity check
- Pipeline cleanliness checks and procedures
- Construction and installation checks
- Vessel and equipment checks (off- and on site)
- Mechanical documentation check
- Vendor and proprietary equipment checkout
- Lubrication
- Alignment checks
- Preservation checks
- Training
- Stores
- Mechanical commissioning document preparation-``things that can go wrong´´
- Things that can go right!
- Chapter 17: Develop training materials
- Typical engineering documents utilized during drafting of training packages
- Operator knowledge training-Classroom
- Operator knowledge training-Vendor presentation
- Operator practical training-``On The Job´´
- Maintenance personnel knowledge training-Classroom
- Maintenance and operator personnel equipment-related training-Workshop and classroom
- Management training-Classroom
- Control system, operator training-Classroom with control system simulation
- Control system, systems engineer training-Typically control system vendor location (potentially site-based)
- Develop training materials-``things that can go wrong´´
- Chapter 18: Develop Standard Operating Procedures (SOPs)
- From the Health and Safety Executive (HSE)-Commissioning guidelines
- Status of guidance
- Operating procedures.
- Title of procedure manual Standard Operating Procedure.
- Notes:
- Includes index.
- Description based on print version record.
- Description based on publisher supplied metadata and other sources.
- ISBN:
- 0-323-85141-X
- OCLC:
- 1243542627
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.