1 option
Public-private partnership monitor / Asian Development Bank.
- Format:
- Book
- Government document
- Author/Creator:
- Asian Development Bank, author.
- Language:
- English
- Subjects (All):
- Public-private sector cooperation--Asia.
- Public-private sector cooperation.
- Business--Environmental aspects--Asia.
- Business.
- Physical Description:
- 1 online resource (xxiv, 573 pages)
- Edition:
- 1st ed.
- Place of Publication:
- Metro Manila, Philippines : Asian Development Bank, [2017]
- Language Note:
- In English.
- Summary:
- The first edition of the Public-Private Partnership (PPP) Monitor tracks the development of the PPP business environment as well as the challenges of doing PPPs in nine of the developing member countries (DMCs) of the Asian Development Bank (ADB): Bangladesh, the People's Republic of China, India, Indonesia, Kazakhstan, Papua New Guinea, the Philippines, Thailand, and Viet Nam. It is divided into four main categories: Regulatory Framework, Institutional Capacity for Implementation, PPP Market Maturity, and Financial Facilities. The PPP Monitor aims to increase the level and quality of private sector participation in infrastructure in the ADB's DMCs by serving as an active platform for dialogue between the public and private sectors.
- Contents:
- Cover
- Title Page
- Copyright Page
- Content
- TABLES AND FIGURE
- FOREWORD
- ACkNOWLEDGMENTS
- DEFINITIONS
- ABBREVIATIONS
- GUIDE TO UNDERSTANDING THE REPORT
- 1. BANGLADESH
- 2. INDIA
- 3. INDONESIA
- 4. KAZAKHSTAN
- 5. PAPUA NEW GUINEA
- 6. PEOPLE'S REPUBLIC OF CHINA
- 7. PHILIPPINES
- 8. THAILAND
- 9. VIETNAM
- APPENDIX: METHODOLOGY
- Tables
- 1 Country-Level Topics
- 2 Sector-Level Topics
- 3 Details of Available Government Support for PPP Projects in Bangladesh
- 4 PPP-Promoting Institutions in Bangladesh
- 5 PPP-Procurement Process in Bangladesh
- 6 PPP-Pipeline of Road Projects
- 7 Examples of Current Toll Rates for PPP Road Schemes
- 8 Typical Risk Allocation Arrangements in Road PPP Contracts
- 9 Challenges for PPP Progress in Road Sector
- 10 PPP Pipeline of Railways Projects
- 11 Challenges for PPP Progress in Rail Sector
- 12 Port Sector Regulatory Agencies in Bangladesh
- 13 PPP Pipeline of Maritime Projects
- 14 Typical Terminal Handling Charges
- 15 Challenges for PPP Progress in Port Sector
- 16 Energy Sector Regulatory Agencies in Bangladesh
- 17 PPP Pipeline of Energy Projects
- 18 Challenges for PPP Progress in Energy Sector
- 19 Water Sector Regulatory Agencies in Bangladesh
- 20 PPP Pipeline of Water Projects
- 21 Chittagong Water Supply and Sewerage Authority
- 22 Challenges for PPP Progress in Water Sector
- 23 Social Infrastructure Sector Regulatory Agencies in Bangladesh
- 24 PPP Pipeline of Social Infrastructure Projects
- 25 Challenges for PPP Progress in Social Infrastructure Sector
- 26 Details of Available Government Support for PPP Projects in India
- 27 PPP-Promoting Institutions in India
- 28 PPP-Procurement Process in India
- 29 Indicative Project Finance Hard Currency Loan Terms
- 30 Indicative Local Currency Loan Terms.
- 31 PPP Pipeline of Road Projects
- 32 Examples of Current Toll Rates
- 33 Typical Risk Allocation Arrangements in Road PPP Contracts
- 34 Challenges for PPP Progress in Road Sector
- 35 Typical Risk Allocation Arrangements in Railway PPP Contracts
- 36 Challenges for PPP Progress in the Rail Sector
- 37 Port Sector Regulatory Agencies in India
- 38 PPP Pipeline of Maritime Projects
- 39 Typical Risk Allocation Arrangements in Port PPP Contracts
- 40 Challenges for PPP Progress in the Port Sector
- 41 Airport Sector Regulatory Agencies in India
- 42 PPP Pipeline of Airport Projects
- 43 Typical Risk Allocation Arrangements in Airport PPP Contracts
- 44 Challenges for PPP Progress in the Airport Sector
- 45 Energy Sector Regulatory Agencies in India
- 46 PPP Pipeline of Energy Projects
- 47 Typical Risk Allocation Arrangements in Energy PPP Contracts
- 48 Challenges for PPP Progress in the Energy Sector
- 49 MSW Sector Regulatory Agencies in India
- 50 Typical Risk Allocation Arrangements in MSW PPP Contracts
- 51 Challenges for PPP Progress in MSW Sector
- 52 Water Sector Regulatory Agencies in India
- 53 PPP Pipeline of Water Projects
- 54 Typical Risk Allocation Arrangements in Water PPP Contracts
- 55 Challenges for PPP Progress in Water Sector
- 56 Social Infrastructure Sector Regulatory Agencies in India
- 57 PPP Pipeline of Social Infrastructure Projects
- 58 Typical Risk Allocation Arrangements in Social Infrastructure PPP Contracts
- 59 Challenges for PPP Progress in Social Infrastructure Sector
- 60 ICT Sector Regulatory Agencies in India
- 61 PPP Pipeline of ICT Projects
- 62 Typical Risk Allocation Arrangements in ICT PPP Contracts
- 63 Challenges for PPP Progress in the ICT Sector
- 64 Details of Available Government Support for PPP Projects in Indonesia
- 65 PPP-Promoting Institutions in Indonesia.
- 66 PPP-Procurement Process in Indonesia
- 67 Indicative Project Finance Hard Currency Loan Terms in Indonesia
- 68 Indicative Project Finance Local Currency Loan Terms in Indonesia
- 69 PPP Pipeline of Road Projects
- 70 Examples of Current Toll Rates on Roads with Open Toll System (Rupiah per trip)
- 71 Examples of Current Toll Rates (Eectiv ff efrom 2015) on Roads with Closed Toll System (Rupiah per km)
- 72 Typical Risk Allocation Arrangements in Road PPP Contracts (Concessions)
- 73 Challenges for PPP Progress in Road Sector
- 74 Railways Sector Regulatory Agencies in Indonesia
- 75 PPP Pipeline of Railway Projects
- 76 Challenges for PPP Progress in the Rail Sector
- 77 Port Sector Regulatory Agencies in Indonesia
- 78 PPP Pipeline of Maritime Projects
- 79 Typical Terminal Handling Charge
- 80 Typical Risk Allocation Arrangements in Port PPP Contracts
- 81 Challenges for PPP Progress in Port Sector
- 82 Airport Sector Regulatory Agencies in Indonesia
- 83 PPP Pipeline of Airport Projects
- 84 Challenges for PPP Progress in the Airport Sector
- 85 Energy Sector Regulatory Agencies in Indonesia
- 86 PPP Pipeline of Energy Projects
- 87 PPP Pipeline of Energy Projects
- 88 Typical Risk Allocation Arrangements in Energy PPP Contracts
- 89 Challenges for PPP Progress in the Energy Sector
- 90 Water Sector Regulatory Agencies in Indonesia
- 91 PPP Pipeline of Water Projects
- 92 Current Water Tariff in Jakarta, 2016
- 93 Current Water Tariff PDAM Tirtawening kota Bandung, 2015
- 94 Typical Risk Allocation Arrangements in Water Concession Contracts
- 95 Typical Risk Allocation Arrangements in Water PPP Contracts
- 96 Challenges for PPP Progress in Water Sector
- 97 PPP Pipeline of ICT Projects
- 98 Challenges for PPP Progress in ICT Sector
- 99 PPP Pipeline of Social Infrastructure Projects.
- 100 Challenges for PPP Progress in the Social Infrastructure Sector
- 101 Details of Available Government Support for PPP Projects in kazakhstan
- 102 PPP-Promoting Institutions in kazakhstan
- 103 PPP Pipeline of Road Projects
- 104 Challenges for PPP Progress in the Road Sector
- 105 PPP Pipeline of Rail Projects
- 106 Challenges for PPP Progress in the Rail Sector
- 107 Airport Sector Regulatory Agencies in kazakhstan
- 108 Challenges for PPP Progress in the Airport Sector
- 109 Energy Sector Regulatory Agencies in kazakhstan
- 110 PPP Pipeline of Energy Projects
- 111 Challenges for PPP Progress in the Energy Sector
- 112 Social Infrastructure Sector Regulatory Agencies in kazakhstan
- 113 PPP Pipeline of Social Infrastructure Projects
- 114 Challenges for PPP Progress in the Social Infrastructure Sector
- 115 PPP P rocurement Process Envisioned in Papua New Guinea (As Envisioned by the PPP Act)
- 116 Port Sector Regulatory Agencies in Papua New Guinea
- 117 PPP Pipeline of Maritime Projects
- 118 Challenges for PPP Progress in Port Sector
- 119 Energy Sector Regulatory Agencies in Papua New Guinea
- 120 PPP Pipeline of Energy Projects
- 121 Typical Risk Allocation Arrangements in Energy PPP Contracts
- 122 Challenges for PPP Progress in Energy Sector
- 123 PPP Pipeline of Projects from Other Sectors
- 124 Details of Available Government Support for PPP Projects in the PRC
- 125 PPP Promoting Institutions in the PRC
- 126 Typical Risk Allocation Arrangements in Road PPP Contracts
- 127 Challenges for PPP Progress in Road Sector
- 128 PPP Pipeline of Railway Projects
- 129 Typical Risk Allocation Arrangements in Road PPP Contracts
- 130 Challenges for PPP Progress in Rail Sector
- 131 Port Sector Regulatory Agencies in the PRC
- 132 PPP Pipeline of Maritime Projects.
- 133 Typical Risk Allocation Arrangements in Port PPP Contracts
- 134 Challenges for PPP Progress in the Port Sector
- 135 Airport Sector Regulatory Agencies in the People's Republic of China
- 136 PPP Pipeline of Airport Projects
- 137 Typical Risk Allocation Arrangements in Airport PPP Contracts
- 138 Challenges for PPP Progress in the Airport Sector
- 139 Energy Sector Regulatory Agencies in the PRC
- 140 Typical Risk Allocation Arrangements in Energy PPP Contracts
- 141 Challenges for PPP Progress in the Energy Sector
- 142 Water Sector Regulatory Agencies in the People's Republic of China
- 143 Typical Risk Allocation Arrangements in Water PPP Contracts
- 144 Challenges for PPP Progress in the Water Sector
- 145 Challenges for PPP Progress in Social Infrastructure Sector
- 146 Details of Available Government Support for PPP Projects in the Philippines
- 147 PPP-Promoting Institutions in the Philippines
- 148 PPP-Procurement Process in the Philippines
- 149 Indicative Project Finance Hard Currency Loan Terms in the Philippines
- 150 Indicative Project Finance Local Currency Loan Terms in the Philippines
- 151 PPP Pipeline of Road Projects
- 152 Examples of Current Toll Rates in the Philippines
- 153 Typical Risk Allocation Arrangements in Road PPP Contracts
- 154 Challenges for PPP Progress in the Road Sector
- 155 PPP Pipeline of Railways Projects
- 156 Typical Risk Allocation Arrangements in Railways PPP Contracts
- 157 Challenges for PPP Progress in the Rail Sector
- 158 Port Sector Regulatory Agencies in the Philippines
- 159 PPP Pipeline of Maritime Projects
- 160 Typical Terminal Handling Charge
- 161 Typical Risk Allocation Arrangements in Port PPP Contracts
- 162 Challenges for PPP Progress in the Port Sector
- 163 Airport Sector Regulatory Agencies in the Philippines
- 164 PPP Pipeline of Airport Projects.
- 165 Typical Risk Allocation Arrangements in Airport PPP Contracts.
- Notes:
- "Publication stock no. TCS179134-2"--Verso of title page.
- Description based on print version record.
- Includes bibliographical references.
- ISBN:
- 9789292610173
- 9292610171
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.