Time-cost optimization of building projects / by Uzair Waheed, B.E., PMP.

Ebook Central College Complete Available online

View online
Format:
Book
Author/Creator:
Waheed, Uzair, author.
Language:
English
Subjects (All):
Construction projects--Management.
Construction projects.
Cost effectiveness.
Physical Description:
1 online resource (81 p.)
Edition:
1st edition
Place of Publication:
Newtown Square, Pennsylvania : Project Management Institute, Inc., 2015.
Language Note:
English
System Details:
text file
Summary:
Traditional wisdom suggests that when it comes to construction projects, any effort that might be made to shorten the planned schedule will necessarily lead to increased costs. In Time-Cost Optimization of Building Projects, however, author Uzair Waheed, B.E., PMP shows that it might just be possible, under certain conditions, to actually decrease both time and cost for building projects. After examining the existing research on the relationship between time and cost in construction projects, the author provides an overview of the project management process and examines the various stages—including initiation, planning, execution, monitoring and control, and closing—that managers and engineers need to consider as they embark upon a new building project.
Contents:
Title Page; Copyright Page; Table of Contents; List of Figures; List of Tables; Acknowledgments; Preface; Chapter 1 - Introduction; Chapter 2 - Basic Concepts of Project Controls; 2.1 - Review of Existing Research Work; 2.2 - What is a Project?; 2.3 - What are Project Controls?; 2.4 - What is Project Management?; 2.5 - Project Management Processes; 2.5.1 - Initiation; 2.5.2 - Planning; 2.5.3 - Executing; 2.5.4 - Monitoring and Controlling; 2.5.5 - Closing; 2.6 - Time Aspect/Scheduling; 2.6.1 - Activity Interdependency Relationships; 2.6.1.1 - Finish to Start Relationship (FS)
2.6.1.2 - Start to Start Relationship (SS)2.6.1.3 - Finish to Finish Relationship (FF); 2.6.1.4 - Start to Finish Relationship (SF); 2.6.2 - Activity Resources; 2.6.3 - Estimate Activity Duration; 2.6.3.1 - One-Point Estimate; 2.6.3.2 - Analogous Estimation; 2.6.3.3 - Parametric Estimate; 2.6.3.4 - Three-Point Estimate (Pert Method); 2.6.4 - Total Float; 2.6.5 - Critical Path; 2.6.6 - Schedule Compression; 2.6.6.1 - Fast Tracking; 2.6.6.2 - Crashing; 2.7 - Cost Aspect/Earned Value Management; 2.7.1 - Planned Value (PV); 2.7.2 - Earned Value (EV); 2.7.3 - Actual Cost (AC)
2.7.4 - Budget at Completion (BAC)2.7.5 - Schedule Performance Index (SPI); 2.7.6 - Cost Performance Index (CPI); 2.7.7 - Estimate at Completion (EAC); 2.7.8 - Estimate to Complete (ETC); 2.8 - S-Curve; 2.9 - Work Breakdown Structure (WBS); Chapter 3 - Methodology; 3.1 - Baseline Project; 3.2 - Bills of Quantities (BOQ); 3.3 - Project Schedule; 3.4 - S-Curve of Baseline Project; 3.5 - Cost/Earned Value Management for Baseline Project; Chapter 4 - Case Studies; 4.1 - Introduction; 4.2 - Alternative 1: Early Completion Simulation; 4.2.1 - Alternative 1 Project Schedule
4.2.2 - Alternative 1 Project S-Curve4.2.3 - Cost/Earned Value Management of Alternative 1; 4.2.4 - Observations; 4.3 - Alternative 2: Delayed Completion Simulation; 4.3.1 - Project Schedule; 4.3.2 - Alternative 2 Project S-Curve; 4.3.3 - Cost/Earned Value Management of Alternative 2; 4.3.4 - Observations; Chapter 5 - Conclusions and Recommendations; 5.1 - Conclusions; 5.2 - Recommednations for Future Study; References
Notes:
Description based upon print version of record.
Includes bibliographical references.
Description based on print version record.
ISBN:
1-62825-103-4
OCLC:
1010935500

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

Find

Home Release notes

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Find catalog Using Articles+ Using your account