My Account Log in

2 options

The 2011 Fukushima nuclear power plant accident : how and why it happened / Yotaro Hatamura [and three others] ; translated by Kenji Iino.

Ebook Central Academic Complete Available online

View online

O'Reilly Online Learning: Academic/Public Library Edition Available online

View online
Format:
Book
Author/Creator:
Hatamura, Yōtarō, author.
Contributor:
Iino, Kenji, translator.
Series:
Woodhead Publishing in energy ; Number 73.
Woodhead Publishing Series in Energy ; Number 73
Language:
English
Subjects (All):
Fukushima Nuclear Disaster, Japan, 2011.
Tohoku Earthquake and Tsunami, Japan, 2011.
Nuclear accidents--Environmental aspects.
Nuclear accidents.
Physical Description:
1 online resource (220 p.)
Edition:
First edition.
Place of Publication:
Cambridge, England : Elsevier : Woodhead Publishing, 2015.
Language Note:
English
System Details:
text file
Summary:
In March 2011 the Fukushima nuclear power plant (NPP) in Japan was hit by an earthquake and subsequent tsunami which resulted in the release of significant amounts of radioactive material. The incident led to the suspension of nuclear programmes by a number of countries. This book provides a definitive account of the accident. Outlines the main sequence of events of the 2011 Fukushima nuclear power plant accident, considers the responses of central and local government, and evaluates the response of the plant owner TEPCO.Describes and assesses the effectiveness of the evacuation process and s
Contents:
Front Cover; The 2011 Fukushima Nuclear Power Plant Accident: How and Why it Happened; Copyright; Contents; List of authors; Woodhead Publishing Series in Energy; Introduction; Chapter 1: The Fukushima-1 nuclear power plant accident; 1.1. Introduction; 1.2. Energy production in Japan; 1.2.1. The energy situation in Japan; 1.2.2. The Fukushima-1 accident: an unprecedented nuclear power accident; 1.3. The Fukushima-1 nuclear power plant; 1.3.1. TEPCO and nuclear power generation; 1.3.2. Overview of Fukushima-1 nuclear reactors; 1.3.3. Operation of the NPP; 1.3.4. Emergency operations
1.4. The Tohoku Area Pacific Offshore Earthquake and tsunami1.4.1. The Tohoku Area Pacific Earthquake; 1.4.2. The Tohuku Area tsunami; 1.4.3. Status of the nuclear reactors before the earthquake; 1.4.4. Seismic movement at Fukushima-1 NPP; 1.4.5. The tsunami at Fukushima-1 NPP; 1.5. Nuclear power safety and disaster prevention systems in Japan; 1.5.1. Nuclear safety laws and regulations; 1.5.2. Administration of nuclear safety; 1.5.3. Organizations in charge of nuclear safety and regulation; 1.5.4. Overview of the legal system for nuclear disaster management
1.5.5. Structure of the Nuclear Emergency Preparedness Act1.5.6. Nuclear Emergency Preparedness Act guidelines on emergency measures; 1.6. Conclusions; References; Chapter 2: The Fukushima nuclear power plant accident: the main sequence of events; 2.1. Introduction; 2.2. Outline of primary facilities at the Fukushima plant; 2.2.1. Reactor building facilities and components; Drywell (D/W); Suppression chamber (S/C); Safety relief valve (SRV); Vent valve; Diesel-driven fire pump (D/DFP); 2.2.2. Electrical power facilities; Metal-clad (M/C) switch gear; Power center (P/C); Direct current (D/C)
2.2.3. Cooling systemsCore cooling systems during normal operation; Core cooling systems during normal shutdown (including after emergency shutdown [SCRAM]); Emergency cooling systems; Isolation condenser (IC); Reactor core isolation cooling system (RCIC); High-pressure coolant injection system (HPCI); Fire protection; 2.3. The sequence of events from earthquake and tsunami to station blackout (SBO); 2.3.1. Events immediately after the earthquake; March 11, 2011, about 14:46: magnitude 6-strong earthquake hits; March 11, about 14:50: Unit 2 RCIC started manually
March 11, 2011, 14:52: Unit 1 IC started automaticallyMarch 11, 15:05: Unit 3 RCIC started manually; March 11, about 15:27: first tsunami wave; March 11, about 15:35: second tsunami wave; March 11, about 15:39: Unit 2 RCIC started manually just before the tsunami damage; March 11, 15:37-42: loss of all AC power; 2.3.2. Loss of electrical power; 2.4. Possible damage caused by the earthquake; 2.4.1. Primary facilities in the reactor building; 2.4.2. Other facilities; 2.5. The condition of Unit 1 after SBO; 2.5.1. March 11, up to 23:50 when abnormal CV pressure was recognized
March 11, about 15:37: IC isolation valves closed with fail-safe function
Notes:
Description based upon print version of record.
Includes bibliographical references and index.
Description based on online resource; title from PDF title page (ebrary, viewed January 6, 2015).
ISBN:
9780081001325
0081001320
9780081001189
0081001185
OCLC:
898422008

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

Find

Home Release notes

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Find catalog Using Articles+ Using your account