1 option
IEEE Std 1490-2003 (Revision of IEEE Std 1490-1998): : IEEE Guide Adoption of PMI Standard a Guide to the Project Management Body of Knowledge / Institute of Electrical and Electronics Engineers.
- Format:
- Book
- Author/Creator:
- Institute of Electrical and Electronics Engineers, author, issuing body.
- Language:
- English
- Subjects (All):
- Standards, Engineering.
- Project management.
- Physical Description:
- 1 online resource (vi, 216 pages)
- Place of Publication:
- New York, N.Y. : Institute of Electrical and Electronics Engineers, 2004.
- Summary:
- Supersedes IEEE Std 1490-1998 SUMMARY: IEEE Std 1490-2003 is an adoption, in its entirety, of A Guide to Project Management Body of Knowledge (PMBOK® Guide). Project scope: The primary purpose of this document is to identify and describe that subset of the PMBOK that is generally accepted and adopt this as IEEE Std 1490-2002. Generally accepted means that the knowledge and practices described are applicable to most projects most of the time, and that there is widespread consensus about their value and usefulness. Generally accepted does not mean that the knowledge and practices described are or should be applied uniformly on all projects; the project managem ... Scope: The primary purpose of this document is to identify and describe that subset of the PMBOK that is generally accepted and adopt this as IEEE Std 1490-2002. Generally accepted means that the knowledge and practices described are applicable to most projects most of the time, and that there is widespread consensus about their value and usefulness. Generally accepted does not mean that the knowledge and practices described are or should be applied uniformly on all projects; the project management team is always responsible for determining what is appropriate for any given project. This document is also intended to provide a common lexicon within the profession fo ... Purpose: SESC has previously adopted the 1996 version of PMIBOK to provide a framework for software engineering project management. PMBOK 2000 added new material to reflect the growth of the knowledge and practices in the field of project management by capturing those practices, tools, techniques, and other relevant items that have become generally accepted. Additionally, clarification text and figures, and corrections, have been added that make the document more valuable to users. SESC intends to adopt the current version of PMBOK, replacing the previous version.
- Notes:
- Description based on publisher supplied metadata and other sources.
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.