3 options
Controlling accidents and insurers' risks in construction : a fuzzy knowledge-based approach / Imriyas Kamardeen.
- Format:
- Book
- Author/Creator:
- Kamardeen, Imriyas.
- Language:
- English
- Subjects (All):
- Construction industry--Insurance.
- Construction industry.
- Construction industry--Risk management.
- Construction industry--Accidents.
- Physical Description:
- 1 online resource (231 p.)
- Edition:
- 1st ed.
- Place of Publication:
- New York : Nova Science Publishers, c2009.
- Language Note:
- English
- Summary:
- There has been a greater concern globally as to how to minimise construction accidents and their consequences on construction workers, contractors, clients, design and project management consultants, and insurance companies. This book introduces new strategies and models that will facilitate readers in the construction and insurance industries in revamping their existing practices towards minimising accidents, improving profitability, and alleviating liabilities. This is a research-based book and chapters in the book are grounded on recent research and best practices. They demonstrate how innovative insurance and construction companies can exploit contemporary research to drive the re-structuring of poor practices that compromise their business sustainability. With diverse audiences in mind, the chapters are written in clear and easy-to-follow styles. The CD enclosed with the book contains the prototype of the KBS that the book discusses. Readers will appreciate this useful appendix of the book that underpins the practical implementation of new theories.
- Contents:
- Intro
- CONTROLLING ACCIDENTSAND INSURERS' RISKSIN CONSTRUCTION: A FUZZYKNOWLEDGE-BASED APPROACH
- Contents
- Preface
- Acknowledgments
- Abbreviations
- Introduction
- The Global Trend of OHSin the Construction Industry
- The Drive towards Re-engineering Workers'Compensation Insurancefor Improving Safety in Construction
- Leveraging by IT
- Focus of the Book
- Structure of the Book
- Workers' CompensationInsurance in Construction
- Origin of Workers' Compensation System
- Workers' Compensation System
- Costs Recovered under the Workers' Compensation System
- 1. Medical Expenses
- 2. Temporary Incapacity
- 3. Permanent Incapacity
- 4. Dependants Death Benefits
- 5. Compensation for Occupational Diseases
- Workers' Compensation Insurance (WCI)
- Premium Rating Methods for WCI
- Experience Modification Rating (EMR) Approachfor Premium Rating
- Manual Rate
- Payroll Unit
- Experience Modification Rate (EMR)
- Example of WCI Premium Calculation
- Computing the EMR
- Computing the WCI Premium
- Shortcomings of the EMR Approach
- Ad-hoc Methods for Premium Rating
- Drawbacks of the System
- Conclusion
- Critical Factors for Premium Ratingof Workers' Compensation Insurancein Construction
- Premium Rating Variables for Construction WCI
- Predicting Future Claims in Construction WCI
- Determining the Mark-up for Construction WCI
- Research Methodology
- Profile of Respondents
- Data Analysis and Discussion
- Important Variables for Premium Rating
- Wage Roll
- Project Hazard Level
- Effectiveness of the Safety Management System on Site
- Contractor's Claims History
- Competition
- Corporate Objectives of the Insurer
- Overhead Costs of Insurance
- Investment Income from Underwritten Premiums
- Less Important Variables for Premium Rating.
- Profit/loss Experience in WCI Business
- Reinsurance Cost
- Amount of Outstanding Claims to the Insurer
- Project Duration
- Placement of Multiple Policies by the Contractor
- Cooperation by the Contractor
- Volume of Business in the Market
- Unimportant Variables for Premium Rating
- Expectation of Potential Business from the Contractor
- Contractor's Size
- Summary of Survey Findings
- Risk Control Strategies for Insurance Companies
- Health insurance
- Motor Insurance
- No Claims Discount (NCD)
- Incentive for Clean Driving Records
- Loyalty Rebate
- Insights for Construction WCI
- Assessing Hazards and Safetyin Building Construction Projects
- Nature of Occupational Injuries in Construction
- Estimating Accident Risks in Construction
- Hazards in Building Construction Projects
- Demolition Hazards
- Excavation Hazards
- Scaffolding and Ladder Hazards
- False Work Hazards
- Roof Work Hazards
- Hazards in Erecting Structural Frameworks
- Crane Hazards
- Construction Machinery and Tools Hazards
- Hazards on Contaminated Sites
- Welding and Cutting Work Hazards
- Hazards in Confined Spaces
- Assessing Hazard Intensity in Building Projects
- Safety Performance MeasurementMethod for WCI
- Essentials of Project Safety Systems
- Safety Performance Assessment Protocol
- New Premium Rating Modelfor Workers' Compensation Insurancein Building Construction
- Proposed Model for WCI Premium Ratingof Building Construction Projects
- Computing the Risk Fee
- 1. Wage Roll
- 2. Project Hazard Index (PHI)
- 3. Project Safety Index (PSI)
- Computing the Mark-up
- Computing the CCIContractor and the SMDClient
- Advantages of the Proposed New Model
- Fuzzy Inference SystemDevelopment Methodologies
- Classical Set Theory.
- Limitations of Classical Set Theory
- Fuzzy Sets
- Fuzzy Membership Functions
- Types of Membership Functions
- Basic Operations of Fuzzy Sets
- Linguistic Variables
- Fuzzy Logic and Approximate Reasoning
- Fuzzy Inference Systems
- Fuzzy Inference Systems Development Cycle
- Defining System Functional and Operational Characteristics
- Case Example
- Defining Fuzzy Sets for System Variables
- Case Example (Cont'd)
- Defining the Fuzzy Rule Base
- IRC Approach
- URC Approach
- Defining Inference and Defuzzification Methods
- System Coding
- System Tuning and Verification
- Fuzzy Knowledge Based SystemModelling for WCI Premium Rating
- Fuzzy KBS Architecture for WCI Premium Rating
- Graphical User Interface (GUI)
- System Database
- Intermediate Processing Unit (IPU)
- Fuzzy Inference Engine and Fuzzy Knowledge Base
- Knowledge Acquisition and Representation
- Past Claims Data Analysis
- Designing the Fuzzy Risk Rate Model
- Interview Survey and Analysis
- 1. Overhead Costs of Insurance
- 2. Investment Income from Underwritten Premiums
- 3. Competition
- 4. Corporate Objectives of the Insurer
- 5. Contractor's Claims History
- Designing the Fuzzy Mark-up Model
- Inference Mechanism in the Fuzzy KBS
- Computing PHI
- Computing PSI
- Computing PSOscore
- Computing RAMscore
- Computing SWPscore
- Computing STCscore
- Computing SIscore
- Computing SMTscore
- Computing SMscore
- Computing EMscore
- Fuzzy Inference for Risk Rate and Mark-up
- Making the Prototype of the Fuzzy KBS
- Developing the IPU and the System Database
- Developing the Fuzzy Inference Subsystem
- Defining the Fuzzy Inference Subsystem
- Membership Functions Development
- Rule Base Development
- Developing the GUI
- Verification of the Fuzzy KBS
- Turing Test for the Fuzzy KBS.
- Workflow Model for the Fuzzy KBS
- Concluding Notes
- Summary
- Research Findings
- Comparison of Research Findingswith the Previous Technique
- Practical Implications for Industries
- Implications for the Construction Industry
- Implications for the Insurance Industry
- Implications for others
- Bottleneck for Implementation
- Knowledge Contributions
- Future Directions
- Appendix 1: Survey Kit
- Appendix 1.1: Interview QuestionnaireSurvey Form
- Factors Influencing Workers' Compensation Insurance Premiumsfor Building Construction Projects
- General Information
- A. Respondent's Particulars
- B. Workers' Compensation Insurance Premium Decisions for BuildingConstruction Projects
- B.1. Project Factors
- B.2. Contractor Factors
- B.3. Insurer Factors
- B.4. Market Factors
- Appendix 1.2: Interview Guideline
- Mark-up Determination for Construction WCI
- B. Interview Questions
- Appendix 2: WCIXpert User Manual
- Installing WCIXpert
- Installation Method
- Getting Started with WCIXpert
- Creating a New Project File
- Hazard Rating of Building Construction Projects
- Hazard Assignment
- Project Hazard Rating
- Safety Rating of Building Construction Projects
- Inference of Risk Rate and Mark-up
- Underwriting a New WCI Policy
- Claims Management
- Producing CCI Contractor and SMD Client Details
- References
- Index.
- Notes:
- Description based upon print version of record.
- Includes bibliographical references and index.
- ISBN:
- 1-61324-299-9
- OCLC:
- 730502321
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.