My Account Log in

1 option

CDM regulations 2007 : procedures manual / Stuart D. Summerhayes.

Ebook Central Academic Complete Available online

View online
Format:
Book
Author/Creator:
Summerhayes, Stuart.
Language:
English
Subjects (All):
Construction industry--Safety regulations--Great Britain.
Construction industry.
Industrial safety--Great Britain.
Industrial safety.
Physical Description:
1 online resource (203 p.)
Edition:
3rd ed., Rev.
Place of Publication:
Oxford, UK ; Malden, MA : Blackwell Pub., 2008.
Language Note:
English
Summary:
This Procedures Manual provides a documentation system which has been developed by a practising CDM co-ordinator for use with the Construction (Design and Management) Regulations 2007.It addresses the full range of obligations on all parties for compliance with the statutory requirements and features:* flow charts* checklists* model formsThe revised Third Edition of the Manual reflects the extensive changes to the CDM Regulations 2007, including:* the new role of CDM co-ordinator* wider and more onerous duties on clients* changes
Contents:
Contents; HOW THIS MANUAL WORKS; Section 1: INTRODUCTION; Section 2: APPLICATION AND INTERPRETATION; 2.1 Application; Table 2.1 THE MAIN RESPONSIBILITIES OF DUTY HOLDERS; 2.2 Interpretation; 2.3 Additional exclusions; Section 3: ALL DUTY HOLDERS; 3.1 Introduction; Table 3.1 PROJECT MANAGEMENT DESCRIPTORS FOUND IN THE REGULATIONS; Figure 3.1 HOLISTIC DIAGRAM; Section 4: THE CLIENT; 4.1 CLIENT FLOWCHART: ALL PROJECTS; 4.2 CLIENT FLOWCHART: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES; 4.3: CLIENT CHECKLIST; 4.4: CLIENT CHECKLIST: NOTIFIABLE PROJECTS; Section 5: THE DESIGNER; 5.1 Introduction
Figure 5.1 REGULATIONS TO BE DISCHARGED BY DESIGNERS5.2 All projects; 5.3 Identification; 5.4 Evaluation; 5.5 Contribution; 5.6 Design change; Figure 5.2 SYSTEMS APPROACH FOR THE DESIGNER; 5.1 DESIGNER FLOWCHART: ALL PROJECTS; 5.2 DESIGNER FLOWCHART: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES; 5.3 DESIGNER CHECKLIST: ALL PROJECTS; 5.4 DESIGNER CHECKLIST: ADDITIONAL DUTIES FOR NOTIFIABLE PROJECTS; Section 6: THE CONTRACTOR; Figure 6.1 CONTRACTOR DUTIES: ALL PROJECTS; 6.1 CONTRACTOR FLOWCHART: ALL PROJECTS; Figure 6.2 CONTRACTOR: ADDITIONAL DUTIES ON NOTIFIABLE PROJECTS
6.2 CONTRACTOR FLOWCHART: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES6.3 CONTRACTOR CHECKLIST: ALL PROJECTS; 6.4 CONTRACTOR CHECKLIST: NOTIFIABLE PROJECTS, ADDITIONAL DUTIES; Section 7: THE CDM CO-ORDINATOR; 7.1 Introduction; 7.2 Appointment; Figure 7.1 CDM CO-ORDINATION DUTIES; 7.1 CDM CO-ORDINATOR FLOWCHART; 7.2 CDM CO-ORDINATOR CHECKLIST; Section 8: THE PRINCIPAL CONTRACTOR; Figure 8.1 REGULATIONS TO BE DISCHARGED BY PRINCIPAL CONTRACTOR; 8.1 PRINCIPAL CONTRACTOR FLOWCHART; 8.2 PRINCIPAL CONTRACTOR CHECKLIST; Section 9: DOCUMENTATION; 9.1 Introduction; 9.2 Pre-construction information
Figure 9.1 FLOW OF PRE-CONSTRUCTION INFORMATION9.3 Construction phase plan; 9.4 Health and safety file; 9.5 Project risk register; 9.1 PROJECT RISK REGISTER (HEALTH AND SAFETY); Section 10: CHECKLISTS AND AGENDAS; 10.1 CHECKLIST FOR NON-NOTIFIABLE PROJECTS; 10.2 CHECKLIST OF ADDITIONAL DUTIES FOR NOTIFIABLE PROJECTS; 10.3 INITIAL DESIGN/CLIENT MEETING: PROMPT LIST; 10.4 PRE-START MEETING: PROMPT LIST (NON NOTIFIABLE PROJECTS); 10.5 PRE-START MEETINGS: PROMPT LIST (NOTIFIABLE PROJECTS) AND ADDITIONAL POINTS; 10.6 PROGRESS MEETING: PROMPT LIST; Section 11: COMPETENCE; WEB PAGE DIRECTORY
BibliographyINDEX
Notes:
Description based upon print version of record.
Includes bibliographical references (p. [191]) and index.
ISBN:
9786612009334
9781282009332
1282009338
9781444302554
1444302558
9781444302561
1444302566
OCLC:
437096833

The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.

Find

Home Release notes

My Account

Shelf Request an item Bookmarks Fines and fees Settings

Guides

Using the Find catalog Using Articles+ Using your account