Delay analysis in construction contracts / P.J. Keane & A.F. Caletka.
- Format:
- Book
- Author/Creator:
- Keane, P. J. (P. John), author.
- Caletka, A. F. (Anthony F.), author.
- Language:
- English
- Subjects (All):
- Construction industry--Cost control.
- Construction industry.
- Construction industry--Planning.
- Production scheduling.
- Construction contracts.
- Physical Description:
- xiv, 274 pages : illustrations ; 26 cm
- Edition:
- 2nd edition.
- Place of Publication:
- Chichester, West Sussex, United Kingdom ; Hoboken, New Jersey : John Wiley and Sons, Inc., 2015.
- Language Note:
- English
- Summary:
- The most significant unanticipated costs on many construction projects are the financial impacts associated with delay and disruption to the works. Assessing these, and establishing a causal link from each delay event to its effect, contractual liability and the damages experienced as a direct result of each event, can be difficult and complex.This book is a practical guide to the process of delay analysis and includes an in-depth review of the primary methods of delay analysis, together with the assumptions that underlie the precise calculations required in any quantitative delay analysis. T
- Contents:
- Cover; Title Page; Copyright; Contents; About the Authors; Preface to the Second Edition; Preface to the First Edition; Chapter 1 Introduction; 1.1 General; 1.1.1 Purpose of this book; 1.1.2 Guidance; 1.1.3 Construction planning and programming; 1.2 Construction delays; 1.2.1 Identifying delays; 1.2.2 Analysing construction delays; 1.2.3 Delay claim life cycle; 1.3 Burning issues in delay analysis; 1.4 Presentation and case study; Chapter 2 Construction Programmes; 2.1 Introduction; 2.1.1 Planning, programming and project controls; 2.1.2 Elements of a successful project
- 2.2 Planning and programming2.2.1 Project planning; 2.2.2 Work breakdown structure; 2.3 CPM programming techniques: the fundamentals; 2.3.1 Activity durations; 2.3.2 Activity relationships; 2.3.3 Event date calculations; 2.3.4 Forward pass; 2.3.5 Backward pass; 2.3.6 Total float; 2.3.7 Constraints; 2.4 Baseline validation; 2.4.1 Joint baseline review; 2.4.2 Programme approval; 2.4.3 The project baseline; 2.5 Other planning techniques; 2.5.1 PERT - Project Evaluation and Review Technique; 2.5.2 Gantt charts (bar charts); 2.5.3 Line of balance; 2.5.4 Critical chain method/theory of constraints
- 2.6 Why use CPM planning or scheduling techniques?2.6.1 Project management; 2.6.2 As-planned programmes; 2.7 Project controls and the project control cycle; 2.7.1 Progress monitoring; 2.7.2 Process and analyse information - Earned Value Method; 2.7.3 The cost and schedule performance curves; 2.7.4 Time control; 2.7.5 Programme updates; 2.8 Records, records, records ...; 2.8.1 Electronic records: management and storage; 2.8.2 Electronic records in practice; 2.8.3 Document controls; 2.9 Predatory programming practices; 2.10 Guidance; Chapter 3 Identification of Construction Delays
- 3.1 Establishing a basis for identifying delay3.1.1 General requirements; 3.1.2 Validation of an as-planned programme; 3.2 Factual evidence and as-built programmes; 3.2.1 As-built programme preparation; 3.2.2 Summary; 3.3 Identification of delay events; 3.3.1 Delay identification; 3.3.2 Recording delays; 3.4 Identification and analysis of disruption; 3.4.1 Disruption and delay; 3.4.2 Calculating disruption; 3.4.3 Establishing cause; 3.4.4 Total cost claims/global claims; 3.4.5 Measured mile; 3.4.6 Graphical presentation; 3.4.7 Summary; Chapter 4 Analysis of Construction Delays
- 4.1 Introduction4.1.1 The use of CPM techniques; 4.1.2 Project planning software; 4.1.3 Identifying delays: cause or effect?; 4.2 Selection criteria and guidance; 4.2.1 The SCL Delay and Disruption Protocol; 4.2.2 The core statements of principle; 4.2.3 AACEI Recommended Practice No. 29R-03: Forensic Schedule Analysis; 4.2.4 Which technique to use under given circumstances; 4.3 Summary; Chapter 5 Delay Analysis Techniques; 5.1 Introduction to delay analysis techniques; 5.1.1 Additive methods of delay analysis; 5.1.2 Impacted as-planned; 5.1.3 Time impact analysis; 5.1.4 Collapsed as-built
- 5.1.5 As-built based methods of analysis
- Notes:
- Description based upon print version of record.
- Includes bibliographical references and index.
- Description based on print version record.
- ISBN:
- 9781118631171 (cloth : alk. paper)
- 9781118631171
- 111863117X
- 9781118631133
- 1118631137
- 9781118631102
- 1118631102
- OCLC:
- 908519952
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.