2 options
Process management in design and construction / Rachel Cooper ... [et al.].
- Format:
- Book
- Language:
- English
- Subjects (All):
- Industrial design--Management.
- Industrial design.
- New products--Management.
- New products.
- Physical Description:
- 1 online resource (206 p.)
- Edition:
- 1st ed.
- Place of Publication:
- Oxford, OX, UK ; Malden, MA, USA : Blackwell Pub., 2005.
- Language Note:
- English
- Summary:
- Process management enables efficiency improvements by identifying and integrating generic sub-processes. This book provides a comprehensive introduction to process management in design and construction in order to meet the business needs of the construction industry in a highly competitive global environment.
- Contents:
- Process Management in Design and Construction; Contents; Preface; Contributors; Acknowledgements; Introduction - Why Process?; 1 The Product Development Process; Product development in manufacturing; The need for new product development (NPD); NPD activities; NPD models; Applying product development to construction: historical background; Construction project process models; Process development in construction; Conclusion; 2 Techniques and Technologies for Managing the Product Development Process in Construction; Approaches to process modelling; Process improvement
- IT and the design and construction processLegacy archive and process information management; Latest technology development; Future vision; 3 Case Study: the Generic Design and Construction Process Protocol; What do we mean by 'process'?; Drivers behind the process; Construction and 'process'; Manufacturing and 'process'; The terms of reference for designing the Process Protocol; Factors identified with problems in the design and construction process; The concept of the Process Protocol: the drivers and philosophies; Operation of the Protocol; The Process Protocol described
- The Process Protocol elementsThe Activity zones; Deliverables; Legacy archive; IT and the Process Protocol; The use of technology during the process; Postscript: the development of the sub-processes and a toolkit; Summary; 4 Implementation Issues; Implementation issues; A case study of implementation: Britannia Walk; Communication; The future; Conclusion; Appendix The Process Protocol Phases and Activity Zones Demystified; Phases; Phase 0: demonstrating the need; Phase 1: conception of need; Phase 2: outline feasibility; Phase 3: substantive feasibility study and outline financial authority
- Phase 4: outline conceptual designPhase 5: full conceptual design; Phase 6: production design, procurement and full financial authority; Phase 7: production information; Phase 8: construction; Phase 9: operation and maintenance; Activity zones; Development management; Project management; Resource management; Design management; Production management; Facilities management; Health and safety, statutory and legal management; Process management; Change management; List of Abbreviations; References; Index
- Notes:
- Description based upon print version of record.
- Includes bibliographical references (p. 148-186) and index.
- Description based on metadata supplied by the publisher and other sources.
- ISBN:
- 9786611318673
- 9781281318671
- 1281318671
- 9780470794388
- 0470794380
- 9780470690758
- 0470690755
- 9780470680483
- 0470680482
- OCLC:
- 437218634
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.