0 options
Current practices to set and monitor DBE goals on design-build projects and other alternative project delivery methods / consultants, David J. Keen, Keen Independent Research LLC, Denver, Colorado [and three others].
- Format:
- Book
- Author/Creator:
- Keen, David J., author.
- Series:
- Synthesis of highway practice ; 481.
- Synthesis of highway practice
- Language:
- English
- Subjects (All):
- Road construction contracts--United States.
- Road construction contracts.
- Project management--United States.
- Project management.
- State transportation agencies--United States--Management.
- State transportation agencies.
- Minority business enterprises--United States.
- Minority business enterprises.
- Women-owned business enterprises--United States.
- Women-owned business enterprises.
- Physical Description:
- 128 pages : illustrations, maps ; 28 cm.
- Place of Publication:
- Washington, D.C. : Transportation Research Board, 2015.
- Summary:
- "TRB's National Cooperative Highway Research Program (NCHRP) Synthesis 481: Current Practices to Set and Monitor DBE Goals on Design-Build Projects and Other Alternative Project Delivery Methods synthesizes current practices and challenges that state departments of transportation (DOTs) face as they set and monitor the Federal Disadvantaged Business Enterprise (DBE) program goals on design-build and other alternative delivery projects. This study focuses on key issues associated with DBE contract goals, including how requirements are established, how submissions are evaluated, how program compliance is monitored through the contracts, and what mechanisms are available to state DOTs for enforcement." -- Publisher's description
- Contents:
- Summary
- Introduction
- Use of alternative delivery methods by state departments of transportation
- Application of traditional disadvantaged business enterprise contract goals to alternative delivery method projects
- New approaches for applying disadvantaged business enterprise contract goals
- Approaches to applying disadvantaged business enterprise goals to construction manager at risk and construction manager/general contractor methods
- Conclusions
- Glossary of terms and acronyms
- References
- Bibliography
- Appendix A. Structured telephone interview guide for state departments of transportation
- Appendix B. Sample RFP language for DBE contract goals for design build (North Carolina Department of Transportation design-build project from 2013)
- Appendix C. Sample DBE plan submitted by proposer in response to a design-build RFP (Texas Department of Transportation design-build project from 2013)
- Appendix D. Sample DBE and workforce/EEO project plans submitted by proposers in response to a design-build RFP (the Louisville-Southern Indiana Ohio River Bridges project, a collaboration between the Kentucky Transportation Cabinet and Indiana DOT)
- Appendix E. Virginia Department of Transportation special provisions pertaining to DBE program for design-build
- Appendix F. Minnesota DOT disadvantaged business enterprise (DBE) special provisions for design-build projects.
- Notes:
- "A synthesis of highway practice."
- Includes bibliographical references (pages 44-49).
- ISBN:
- 9780309271912
- 0309271916
- OCLC:
- 914242949
The Penn Libraries is committed to describing library materials using current, accurate, and responsible language. If you discover outdated or inaccurate language, please fill out this feedback form to report it and suggest alternative language.